![background image](http://html.mh-extra.com/html/nec/express-5800-120ed/express-5800-120ed_installation-procedures-manual_251150017.webp)
Express5800/120Ed Rack Mount installation Procedures 15
Installing the New Front Bezel
1.
Ensure that the left side panel of the server unit is removed as described
earlier.
2.
Position the server unit on its right side.
Figure 11. Install the Front Bezel Handles
3.
Install two handles onto the new front bezel with the four screws supplied.
See Figure 11.
4.
Remove the “Device Bay Door” located on the front of the new front bezel
(see Figure 12). Loosen the captive spring screw and slide the door out of
the front bezel.
Note:
Save the door for reinstallation.
Summary of Contents for Express 5800/120Ed
Page 1: ...Express5800 120Ed Rack Mount Kit Installation Procedures PN 455 01607 001 ...
Page 4: ......
Page 28: ......
Page 29: ......