![NCR FastLane SelfServ 7358-K112 Instructions Manual Download Page 37](http://html1.mh-extra.com/html/ncr/fastlane-selfserv-7358-k112/fastlane-selfserv-7358-k112_instructions-manual_3738925037.webp)
34
2-Bag Bagwell Upgrade
5. Open the Tower Cabinet to access the I/O Box .
6. Unplug the pre-installed USB Power Cable from the Scale Controller in the new
Bagwell and plug the host connector to USB G port of the I/O Box.
7. Route the cables along the cable guides, as shown in the image below. Ensure that
the cable bundle is not in contact with the Tri-Light Pole Bracket.
Note:
For more information about routing cables, refer to SCO Release 6 Lite Plus
Cable Routing Instructions (497-0521474).