![NCR FastLane SelfServ 7358-K112 Instructions Manual Download Page 24](http://html1.mh-extra.com/html/ncr/fastlane-selfserv-7358-k112/fastlane-selfserv-7358-k112_instructions-manual_3738925024.webp)
2-Bag Bagwell Upgrade
21
5. If not already present, partially thread the two (2) upper screws on the Bagwell side
of the Core. Leave approximately ¼ inch of the threads exposed.
6. Mate the new Bagwell to the Core by lifting the frame up and over the partially
threaded screws.
Note:
Ensure that the two frontmost key holes on the Bagwell are used.