![NCR FastLane SelfServ 7358-K112 Instructions Manual Download Page 14](http://html1.mh-extra.com/html/ncr/fastlane-selfserv-7358-k112/fastlane-selfserv-7358-k112_instructions-manual_3738925014.webp)
2-Bag Bagwell Upgrade
11
c. Lift Bagwell up and away from the Core Cabinet. The upper screw heads will
pass through the key holes in the Bagwell side support.
Note:
The two (2) upper screws may be left in place if a new Bagwell will be
installed in the same orientation. Otherwise, remove the screws from the side of
the Core.