![NCR 7350-K160 Kit Instructions Download Page 47](http://html1.mh-extra.com/html/ncr/7350-k160/7350-k160_kit-instructions_3732513047.webp)
7350 3-Bag Bagwell Upgrade
1-43
11. Install the Scanner/Scale. To install the Scanner/Scale, follow these steps:
a. Grasp the Scanner/Scale by its handles and lower it into the checkstand cutout.
Caution:
Be careful not to damage any of the cables.
b. Place the back of Scanner/Scale on the two supports located on the E-Box mount.
c. Lower the Scanner/Scale unto the scanner bucket area.
d. Install the Scale Plate by placing it on top of the load cells.
12. Ensure the E-Box can rotate freely by adjusting the position of the cable as needed.
USB Power Cable should be routed through the left hand lower Core access cutout
into the new Bagwell.