![NCR 7350-K160 Kit Instructions Download Page 42](http://html1.mh-extra.com/html/ncr/7350-k160/7350-k160_kit-instructions_3732513042.webp)
1-38
7350 3-Bag Bagwell Upgrade
Routing Cables for No-Bag unit
These are additional steps in routing cables when upgrading a No-Bag unit to a 1-Bag
unit:
Note:
Use the new USB Power Cable. Route the USB Power Cable to the E-Box first
before installing new Bagwell.
1. Unlock and open the upper Cabinet Door.
2. Lift the Scale Plate from the Scanner.