3
Contents
1.2 Precautions Related to Installation and Wiring Work
1.3 Precautions Related to Operation and Inspection
2.3 Monitor LED Lighting Patterns
2.4 CC-Link Station Number Setting Switch
2.5 CC-Link Transmission Speed Setting Switch
4 Installation and Connections
4.2.2 Performing Wireless Communication (Installing Antenna)
4.3.2 Wired Connection to Units
5.1 Precautions for Inspection
7 Dimensional Outline Drawings