21
4
Installation and Connections
Installation of CC-Link Connector
1
Insert the ① Connector into the
transceiver.
2
Tighten the two ② Screws with a
flathead screwdriver.
(Recommended tightening torque: 0.3 N m
(2.65 lbf in.))
Connecting the CC-Link Connector to Lead Wire
1
Remove 10 mm (0.394 in.) of
insulation coating from the ① Lead
wire.
2
While pressing the ② Orange
button with a precision flathead
screwdriver, insert the lead wire.
After the lead wire is inserted, release
the button to secure the wire.
10mm
(0.394 in.)
① Connector
② Screws
① Lead wire
② Orange button