background image

Requirements

In order to install the Navitar PSD-1 Projector Security Box you 

must have a projector ceiling mount system with: 

1 ½” to 2” diameter column and;

a minimum length of 6.5” between the ceiling and pro-

jector mount.

Items Required for Installation

 

Installation Instructions

The PSD-1 Projector Security Box attaches to your

ceiling mount projector system quickly and easily. 

Unpack the PSD-1 and set aside the Torx wrench,  

tubular activation key, and weather stripping.

Install two (2) 9-volt batteries (purchased separately) by 

pressing them into slots.  

Adhere included weather stripping to the entire ½” wide 

lip of the PSD-1. The weather stripping will provide a 

tight seal and keep dirt and dust particles away from 

the unit.

1.

2.

3.

Use the Torx wrench to unscrew the large mounting 

screw in the center opening to allow the PSD-1 to easily 

slide up the column of the ceiling mounting plate. 

With the open side (bottom) of the PSD-1 facing down, 

slide the unit as far up the column of the ceiling 

mounting plate as possible.

Use the enclosed Torx wrench to lock down the 

mounting screw and secure the PSD-1 in place allowing 

you to assemble your projector ceiling mount unit per 

the manufacturer’s specifications.

Once the projector ceiling mount unit is properly and 

securely installed, use the Torx wrench to loosen the 

mounting screw of the PSD-1 and lower the unit slowly 

until the weather stripping is in full contact with the 

projector mounting plate or universal mount thus 

completely enclosing the mounting hardware. Tighten 

the mounting screw to secure the PSD-1 in place. 

With your fingers, loosen the two thumb screws on the 

back of the unit allowing the impact switch to slide down 

and come into contact with the projector. 

Place enough pressure on the security box enclosure 

to fully compress the impact switch button against the 

projector. Tighten the two thumb screws to secure the 

impact switch in place.

Insert the tubular activation key into the alarm activation 

keyway and turn clockwise to activate the alarm.

Test the unit by slightly raising the security box away 

from the projector. If alarm sounds, the internal trip 

alarm has been triggered and the security box has been 

installed correctly. 

Disarm the alarm by inserting the tubular activation key 

and turning counter-clockwise*. Lower the enclosure 

back into position. Repeat steps 8-10 to secure and 

activate unit. 

Changing the Batteries

Navitar recommends testing your PSD-1 unit frequently 

(step 11) and changing the two 9-volt batteries based on the 

manufacturer’s recommended lifespan. 

To change the batteries, disarm the unit, loosen the mounting 

screw and raise the PSD-1 unit away from the projector. Insert 

new batteries into the battery slots. Always replace both

batteries at the same time.

Reinstall the unit as specified in steps 7-11. 

4.

5.

6.

7.

8.

9.

10.

11.

12.

Navitar, Inc.

 200 Commerce Dr., Rochester, NY 14623 USA

Phone (585) 359-4000 

 Fax (585) 359-4999

www.presentation.navitar.com 

 E-mail [email protected]

Tubular 

activation keys

Torx wrench

Weather stripping

Back View

Alarm  

activation 

keyway

Thumb 

screws

Center opening

Impact switch

Battery 

slots

Mounting 

screw

1/2” lip

Bottom View

Two 9-volt 

batteries 

(not included)

rev 062006

Installation Instructions - continued

The alarm will sound continuously for over an hour if    

   not disarmed properly.

Reviews: