background image

Page 16

LAT PULLDOWN

26.  Use a 5mm allen key to loosen 

the four (4) set screws located at 

the bottom of the weight stack 

guide rods, once the set screws 

are loose the guide rods should 

drop down.

F

ig

. 25

27.  Swing the guide rods forward 

out of the machine then remove 

the guide rode stop caps.

F

ig

. 26

28.  Starting from the bottom of 

the weight stack (731-3204), 

carefully slide each weight plate 

down the guide rods.

29.  Once the entire weight stack has 

been installed, replace the guide 

rod caps, reinstall the rods back 

into place, and tighten the set 

screws loosened in step 26.

START

F

ig

. 27

Summary of Contents for Inspiration 4-Station

Page 1: ...OWNER S MANUAL Nautilus Inspiration 4 Station Core Health Fitness...

Page 2: ...LIGHT 2 IMPORTANT SAFETY INSTRUCTIONS 3 IMPORTANT LABEL LOCATIONS 5 INSTALLATION 7 LOW ROW 8 TRICEP PRESS 12 LAT PULLDOWN 16 CABLE CROSS 20 STRENGTH PRODUCT USE 27 MAINTENANCE 30 SUPPORT AND SERVICE 3...

Page 3: ...on 4 Station Overall Weight Width Length Height Max User Weight 1732 lbs 396 kg 60 in 81 cm 131 in 208 cm 96 in 154 cm 350 lbs 159 kg All products may be covered by US and Foreign Patents and Patents...

Page 4: ...r weight of 350 lbs 159 kg Free Area Training Area Free Area Training Area Required Clearance 8 Assemble and operate the machine on a solid level surface Position the machine with sufficient clearance...

Page 5: ...diately or the equipment removed from service until the repair is made 12 Cables pose an extreme liability if used when frayed Always replace any cable at first sign of wear Consult Nautilus if uncert...

Page 6: ...25mm 4 R0 5 NOTES OVERLAY NOT TO BE AFFECTED BY WASH WIPE USING ALCOHOL ISOPROPYL AMMONIA AND OR A 5 SODIUM HYPOCHLORITE TO WATER SOLUTION CLOROX DRAWING ARTWORK AND DIMENSIONS ARE FOR REFERENCE ONLY...

Page 7: ...ED TO ADJUST THE TENSION FASTENER ON THE FRONT PULLY BLOCK OVER TO ADJUST THE FRONT ROLLER LOOSEN THE JAM NUT ON THE SET SCREW TIGHTEN THE SET SCREW GRAB HANDLE AND ROCK IT UP AND DOWN IF IT DOES NOT...

Page 8: ...3648 XX WELD LAT PULL LOWER 731 3142 ASSY WGT STK 100kG CC 731 7348 PLACARD CABLE CROSS NAU 731 8118 STICKER INSTRUCTIONS TROLLEY 731 3194 WELD BALET BAR RIGHT BLACK 731 3174 BRKT BALET BAR MNT 731 3...

Page 9: ...the frame then remove the cap 731 3185 Fig 1 2 Use a 5mm allen key to loosen the four 4 set screws located at the bottom of the weight stack guide rods once the set screws are loose the guide rods sho...

Page 10: ...d caps reinstall the rods back into place and tighten the set screws loosened in step 3 START Fig 4 6 Use a 4mm allen key to secure the placard 731 3164 XX to the frame using three 3 pieces of the M6...

Page 11: ...of the M10 flat washer 731 0367 and two 2 pieces of the weldment mount bracket 731 3221 Fig 7 9 Set the upper low row frame into place Fig 8 10 Use a 16mm socket and a 16mm open ended wrench to secure...

Page 12: ...ecuring the upper weldment to the tower frame using three 3 pieces each of the M10 x 30mm bolt and M10 nylock nut and six 6 pieces of the M10 flat washer Fig 10 12 Ensure that the cable is routed prop...

Page 13: ...the M10 jam nut to lock the cable in place Fig 13 TRICEP PRESS 14 Use a 5mm allen key to loosen the four 4 set screws located at the bottom of the weight stack guide rods once the set screws are loose...

Page 14: ...he guide rod caps reinstall the rods back into place and tighten the set screws loosened in step 14 START Fig 16 18 Use a 4mm allen key to secure the placard to the frame using three 3 pieces of the M...

Page 15: ...ces of the M10 flat washer and two 2 pieces of the bracket mount Fig 19 21 Set the tricep press weldment 731 7525 XX into place Fig 20 22 Use a 16mm socket and a 16mm open ended wrench to secure the u...

Page 16: ...e M10 x 30mm bolt and M10 nylock nut and six 6 pieces of the M10 flat washer Fig 22 24 Ensure the cable is routed properly Fig 23 25 Use a 10mm open ended wrench to secure the cable to the weight stac...

Page 17: ...wn Fig 25 27 Swing the guide rods forward out of the machine then remove the guide rode stop caps Fig 26 28 Starting from the bottom of the weight stack 731 3204 carefully slide each weight plate down...

Page 18: ...731 7351 and the add on decal to the placard Fig 28 31 Set the lat pulldown weldment 731 3648 XX into place Fig 29 32 Use a 16mm socket and a 16mm open ended wrench secure the back rest weldment to th...

Page 19: ...ment to the tower frame using two 2 pieces each M10 x 75mm bolt and M10 nylock nut four 4 pieces of the M10 washer and one 1 piece of the 76 2mm bracket connector Fig 32 35 Finish securing the upper w...

Page 20: ...Ensure the cable is routed properly Fig 34 37 Use a 10mm open ended wrench to secure the cable to the weight stack then use a 16mm open ended wrench to tighten the M10 jam nut to lock the cable in pl...

Page 21: ...n Fig 36 39 Swing the guide rods forward out of the machine then remove the guide rode stop caps Fig 37 40 Starting from the bottom of the weight stack 731 3142 carefully slide each weight plate down...

Page 22: ...n ended wrench to secure the right side balet bar 731 3194 to the tower frame using two 2 pieces each of the M10 x 140mm button head cap screw and M10 nylock nut and four 4 pieces of the M10 flat wash...

Page 23: ...e screw 731 3161 Fig 42 47 Install the pulley assembly 731 0731 into the upper support weldment then use a 16mm socket and a 16mm open ended wrench to secure the pulley into the weldment using two 2 p...

Page 24: ...Fig 45 50 Secure the upper weldment to the tower frame using three 3 pieces each of the M10 x 30mm bolt and M10 nylock nut and six 6 pieces of the M10 flat washer Fig 46 51 Use a 16mm socket and a 16...

Page 25: ...Page 24 52 Ensure the cable is routed properly See Fig 48 Fig 52 Fig 48 Fig 49 Fig 50...

Page 26: ...Page 25 Fig 51 Fig 52 53 Use a 13mm open ended wrench to secure the cable to the trolley using one 1 piece of the M8 nylock nut 731 0365 Fig 53...

Page 27: ...26 54 Install the end cap 731 0209 into the end of the lat pull down weldment Fig 54 55 Reinstall the tower cap and using a 2 phillips screwdriver reinstall the two 2 M3 x 13mm self tapping screws Fi...

Page 28: ...of the purchaser of Nautilus Inspiration Strength products to read the owner s manual review the following pages and instruct all individuals whether they are the end user or supervising personnel on...

Page 29: ...STATION WWW NAUTILUSSTRENGTH COM U S 800 503 1221 CHEST PRESS BICEPS CURL AB ADDUCTION AB CRUNCH Fig 56 Cable Station Instructions MULTI STATION 731 3644 LOW ROW WWW NAUTILUSSTRENGTH COM U S 800 503...

Page 30: ...731 3208 TRICEPS PRESS WWW NAUTILUSSTRENGTH COM U S 800 503 1221 1 2 Fig 58 Triceps Press Instructions MULTI STATION 731 4186 LAT PULL DOWN WWW NAUTILUSSTRENGTH COM U S 800 503 1221 1 2 Fig 59 Lat Pu...

Page 31: ...ools listed available when performing maintenance Tool Socket Set SAE Screwdriver Set Phillips Socket Set Metric Screwdriver Set Flat Socket driver Tape Measure Open end wrenches SAE Ball Pene Hammer...

Page 32: ...ined for damage and wear and repaired It is the sole responsibility of the owner of this equipment to ensure that regular maintenance is performed Worn or damaged parts must be replaced immediately or...

Page 33: ...t stack should be cleaned once every six months with a mild soap and water dampened cloth to remove all dust and accumulated contaminants Caution should be taken to not leave excess moisture after cle...

Page 34: ...her neglected or in many cases facilities over lubricate without cleaning the old dirty lubricant off prior to applying the new This results in a build up of dirty contaminants that will cause prematu...

Page 35: ...ps support corehandf com INSPIRATION Warranty information is available at https corehandf com warranty Contact Information CORE HEALTH FITNESS 4400 NE 77th Avenue Suite 300 Vancouver WA 98662 Telephon...

Page 36: ...2019 CORE HEALTH FITNESS LLC PART NUMBER 620 8707 REV A...