Chapter4. System Installation 

 

Unpacking   
 

 Use the following instructions to unpack the MS500 with it on the palette. 

1. Cut the straps that are fastened around the box with a knife.   

(Be careful when cutting the straps. Refer to figure below. 

2. Use an appropriate tool to remove the nails from the palette. (Refer to figure below) 
3. Remove the lid, then box from the top. Do not discard the packaging materials until you have 

verified any shipping damage claim. Contact your distributor immediately if you see any 
shipping damage. Store the box in a safe place to re-use or discard of appropriately. 

4. Verify the contents carefully with the packing list to be sure all items listed are included. Notify 

  your distributor of any shortages. 

5.

 

If only the palette needs to be removed, lift the whole machine from the bottom and set it 

  aside.   
 

   

 

 
 
 

 Removing the MS500 from the Palette 

  1. Remove bolts from equipment locking bracket. 
  2. Remove the Adjustor with a spanner. 
  3. Lift the MS500 using a lifting device. 

  4. Move the MS500 to the installation site. 

   

  PRECAUTION:

   

MS500 machine is very heavy equipment and can cause injuries if not handled with caution. 
Read the following carefully. 
▪ Firmly close the vault door and lock the door by turning the knob completely.   
▪ Only experienced staff members should move the heavy machine. 
▪ Do not tilt the ATM when moving.   

                                             

Summary of Contents for MS500

Page 1: ...Installation Manual MS500 V01 00 05 2016 06 17 2016 Nautilus Hyosung Inc All Rights Reserved...

Page 2: ...Service Clearance 3 Updated Anchor Bolts Location Sheet Sample 4 3 V01 00 02 2015 01 09 Updated Dimension Installation and Service Clearance 3 4 V01 00 03 2015 04 11 Added the weight of MS500 3 Updat...

Page 3: ...es 1 2 Abbreviations 1 2 Safety Precautions 1 4 Related Document 1 6 Chapter2 Introduction 2 1 About the MS500 2 1 System Identification Label 2 2 Chapter3 Installation Information 3 1 Installation En...

Page 4: ...e contact maintenance staffs of Nautilus Hyosung For the contact of maintenance staffs of Nautilus Hyosung see the E mail addresses and telephone numbers provided separately What is in This Manual Thi...

Page 5: ...enance refer to the supervisor operator and technician s tasks performed to keep the operational Screen refers to the text appearing on the customer display Abbreviations In this document the abbrevia...

Page 6: ...Description 11 I F Interface 12 LCD Liquid Crystal Display 13 OPL Operation Panel for Customers to Operate 14 OSD board On Screen Display Board 15 P S Power Supply 16 PNC Panel Control Board 17 S W S...

Page 7: ...operate the equipment Note This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide rea...

Page 8: ...ipment in an area away from any combustible materials The equipment may catch on fire from overheating or short circuit of the power supply unit 5 Disassembly Warnings Do not disassemble or modify the...

Page 9: ...pter1 Preface 2016 Nautilus Hyosung Inc All Rights Reserved 1 6 Related Document The following documents complement this one Operator Manual Service Manual Contact your NHA representative to obtain co...

Page 10: ...ce which occurs when bank clerks directly handle cash with customers and relieves workload upon tellers by processing deposit withdrawal of cash automatically Relieves risks and burden of directly han...

Page 11: ...Manual Chapter2 Introduction 2016 Nautilus Hyosung Inc All Rights Reserved 2 2 System Identification Label The System Label below shows the layout of the product identification label which is fixed in...

Page 12: ...meets the recommended temperature and humidity specifications supplied with the unit The following conditions should be met before installing the equipment 1 Avoid locations where intense direct ligh...

Page 13: ...Installation Manual Chapter3 Installation Information 2016 Nautilus Hyosung Inc All Rights Reserved 3 2 Exterior Front Elevation...

Page 14: ...Installation Manual Chapter3 Installation Information 2016 Nautilus Hyosung Inc All Rights Reserved 3 3 Side Elevation Plan View...

Page 15: ...Installation Manual Chapter3 Installation Information 2016 Nautilus Hyosung Inc All Rights Reserved 3 4 Service Area Minimum Installation...

Page 16: ...on Information 2016 Nautilus Hyosung Inc All Rights Reserved 3 5 Recommended Installation Note Hyosung recommends it is more convenient for your service personnel to have enough maintenance space as d...

Page 17: ...Installation Manual Chapter3 Installation Information 2016 Nautilus Hyosung Inc All Rights Reserved 3 6 Side Elevation...

Page 18: ...Installation Manual Chapter3 Installation Information 2016 Nautilus Hyosung Inc All Rights Reserved 3 7 Installation Frame Bottom of ATM...

Page 19: ...Installation Manual Chapter3 Installation Information 2016 Nautilus Hyosung Inc All Rights Reserved 3 8 Anchor Point...

Page 20: ...Installation Manual Chapter3 Installation Information 2016 Nautilus Hyosung Inc All Rights Reserved 3 9 Anchor Detail...

Page 21: ...amage Store the box in a safe place to re use or discard of appropriately 4 Verify the contents carefully with the packing list to be sure all items listed are included Notify your distributor of any...

Page 22: ...that the unit will not tip over when opening the upper lower modules or the door 2 Place the anchor bolt location sheet where the MS500 is to be installed 3 Drill the correct diameter and depth holes...

Page 23: ...Installation Manual Notes 2016 Nautilus Hyosung Inc All Rights Reserved Notes 1 Notes...

Reviews: