Installation Manual Appendix1. Supplementary Component
© 2016
Nautilus Hyosung Inc.
All Rights Reserved
.
A1-1
Appendix 1. Supplementary Component
Checking the Supplementary Component
▶
Checking the Supplementary Component
1. Unpack the attachment Box.
2. The Supplementary Components should have the following items;
#
Item
components
1
3 system keys
2
6 CCIM keys
3
4 BRM keys
4
Receipt Roll, Receipt Axis, AC Cord, LAN cable