NV10LT/NV7.5LT INSTALLATION MANUAL
CONNECTING AC POWER
VERSION 5.0 2021-03-01
PAGE 2.5.3
11. If the UPS interface option has been installed, route the ac cable from the user-provided UPS,
through the desired top or bottom entry point (see
), to the UPS interface
assembly at the bottom of the transmitter. Install the Nautel provided mating connector and install
the ac cable on the UPS interface assembly. Refer to
“Configuring an External UPS” on page 2.9.11
to configure the transmitter to recognize the UPS. See the NV10LT/NV7.5LT Pre-installation Manual
for more information.
12. Re-install the grilled panel that was removed in
, using four M4 screws.
13. Re-install the bottom rear panel removed in
, using the retained M5 screws.
14. Do not install the rear filter panel at this time.
Summary of Contents for NV10LT
Page 2: ......
Page 4: ......
Page 8: ...NV10LT NV7 5LT INSTALLATION MANUAL PAGE 2 VIII VERSION 5 0 2021 03 01...
Page 36: ...NV10LT NV7 5LT INSTALLATION MANUAL INSTALLING PROGRAM INPUTS PAGE 2 7 4 VERSION 5 0 2021 03 01...
Page 54: ...NV10LT NV7 5LT INSTALLATION MANUAL COMMISSIONING PAGE 2 9 12 VERSION 5 0 2021 03 01...
Page 58: ...NV10LT NV7 5LT INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 10 4 VERSION 5 0 2021 03 01...
Page 68: ...NV10LT NV7 5LT INSTALLATION MANUAL LIST OF TERMS PAGE 2 12 2 VERSION 5 0 2021 03 01...
Page 69: ......