If an operating room is available, it is recommended to use the installation method shown in Figure 4. 
Otherwise, only the drain pipe and the overflow pipe can be inserted into the floor drain. As shown in 
Figure 5, make sure that the two pipes are fixed to the wall to prevent the pipe from being flushed out of 
the floor drain when emptying. This can have detrimental effects and lead to damage.

 

 

Install connections

 

 

 

The connection and laying of the pipe system is carried out in accordance with the provisions 
of the construction standards for water supply and drainage pipes. The inlet and outlet interfaces 
of the water softener and the water pipe interfaces are connected by a ¾″ PPR inner pipe or a 
corrugated pipe and must be installed on the same axis (see installation plan). The inlet and 
outlet points must not be installed in reverse.

 

 

Connect the water inlet and outlet pipes, the drain pipes, and the overflow pipes in sequence to 
ensure  that  all  connections  are  tight  and  that  there  are  no  leaks.  It  is  recommended  to  use 
flexible pipes to connect the water softener inlets and outlets, the drain, and the overflow (note: 
304 stainless steel, alloy forged steel, high-strength engineering plastics, and other materials 
are to be used for the connection of pipe fittings and valves; valves and pipe fittings made of 
iron are strictly prohibited).

 

 

Installing the drain and overflow pipes

 

 

 

First loosen the clamp and insert it into the prepared pipe, then insert the pipe into the drain and 
overflow connection to the floor, and finally turn the clamp onto the connection of the pipe, drain, 
and overflow connection and tighten it firmly. The drain and overflow pipe must be secured with 
a  clamp.  (

Note!

 

This  procedure  is  intended  to  ensure  that  the  hose  is  not  pushed  away  or 

pushed out of the sewer if the flat is connected to the sewer or the water pressure of the floor 
drain is high).

 

 

The position of the control valve must be higher than the floor drain and the length of the drain 
and overflow pipe must not exceed 2 m. The installation of shut-off devices in the drain pipe is 
strictly prohibited. The sealing of the pipe fittings may only be made of PTFE.

 

 
 

Instructions for first use

 

 

1.

 

Initial settings of the operating system

 

When  the  softener  is  switched  on  for  the  first  time,  the  system  indicates  that  water  is  being 
added. Press the button 

 to access the operating system and set the current time, the regen-

eration time, and the raw water hardness.

 

 

2.

 

First water supply for water softeners

 

Before the first water supply, close the water inlet valve of your building, switch the bypass valve 
to the operating position and to the unlocked state, press the button 

 to start regeneration; 

“system is back washing” is shown on the display panel. When the power is switched off, the 
water softener remains in backwash mode. Open the water inlet valve slowly to ¼ (opening it 
quickly can damage the appliance and lead to resin loss). At the beginning, the sound of slowly 
escaping air should be heard in the blow-off pipe. After the air in the FRP tank has escaped 
(i.e., when the water in the blow-off pipe flows out evenly), the water inlet valve should be fully 
opened.

 

 

Attention!

 

If the water inlet valve is fully opened directly, the water will flow into the softener too quickly, 

causing the softener resin in the tank to be stirred up, which will easily cause the upper collection tank 
to break and damage the softener. It is therefore necessary to open the water inlet valve slowly ¼ to 
allow the water to flow slowly into the tank, release the air in the tank and fill the tank with tap water. 
During backwashing, the outlet of the blow-off pipe must be checked several times until it is really clean. 
The backwash time should not be less than 5

 

min.

 

 

3.

 

First filling of the brine tank with water

 

After completing the above steps, switch on the system. Press   to call up the brine and slow 
rinse option, then press   once to call up the refill option. In the refill option, a certain amount 

Summary of Contents for SOFT-HT1B

Page 1: ...rating instructions and safety information prior to initial operation Technical changes reserved Illustrations functional steps and technical data may deviate insignificantly due to continuous further...

Page 2: ...ave found an error or wish to suggest an improvement we look forward to hearing from you Send us an e mail to service wiltec info or use our contact form https www wiltec de contacts The most recent v...

Page 3: ...ater softener is only suitable for filtering pre treated tap water It cannot be used to filter water with an unknown level of contamination or an unknown proportion of harmful organisms The water soft...

Page 4: ...ftener shocks to the water must be avoided e g by quickly opening or closing the valve and switching off the water pump in emergencies Do not apply force to the machine and avoid direct sunlight and e...

Page 5: ...ntrol box 2 Relief valve 12 Belt 3 Central pipe 13 Brine tank and valve 4 3 way valve 2 5 14 Casing 5 Top cover 15 Overflow fitting 6 Drawer for salt addition 16 0615 FRP tank 7 Control panel 17 Stain...

Page 6: ...Page 6 01 2024 1 Functionality Name Letter Name 1 Intake A Service 2 Process B Backwash 3a Outlet softened water C Brine and slow washing down flow 3 Raw water D Quick re fill 4 Tank 2 E Re fill 5 Tan...

Page 7: ...on The purpose is to wash out the suspended particles from the water which are trapped and clumped on the surface of the resin and damaged resin parts Secondly a loosely compacted resin layer favours...

Page 8: ...utants in the water pipe contam inate the softener Therefore first switch the bypass valve of the softener to the bypass station open the tap in the house and drain the water from the dirty water supp...

Page 9: ...work due to stresses in the pipework during long term use It is forbidden to combine the overflow and drain pipes in one pipe and insert it into the waste water outlet If the waste water pipe or floor...

Page 10: ...take 2 Outlet 5 Inlet pipe 3 Outlet pipe 6 Clamp fixed water pipe Note Please note the actual height and installation environment of the selected product 2 Connect the bypass pipe connection to the wa...

Page 11: ...o the wall with a ring clamp to prevent the hose from jumping out of the waste pipe 4 Return to the second step Place the product in the corresponding position of the installed con nection Connect the...

Page 12: ...1 Inlet pipe 4 Overflow in the outlet pipe 2 Outlet pipe 5 Drain pipe 3 Inlet pipe 6 Pipe Name Name 1 O ring 3 Outlet 2 Intake Note Please check whether the large insert on the bypass valve is insert...

Page 13: ...et pipe 4 Overflow in the outlet pipe 2 Outlet pipe 5 Drain pipe 3 Inlet pipe 6 Pipe Name Name 1 O ring 3 Outlet 2 Bypass mixing valve 4 Intake Note Make sure that the large clip on the bypass valve i...

Page 14: ...into the operating position Fig 2 Operating position diagram Name description Name 1 Bar 6 Maintenance 2 Bypass 7 Figure 2 3 Flow meter 8 Bypass 4 Fastener 9 Figure 3 5 Press push rod set working posi...

Page 15: ...the higher the de gree of hardness of the outgoing water If the water mixing function is not required the water mixing plug can be installed Name Name 1 With water mixing feature 4 Without mixing fea...

Page 16: ...f the floor drain is high The position of the control valve must be higher than the floor drain and the length of the drain and overflow pipe must not exceed 2 m The installation of shut off devices i...

Page 17: ...vel As a rule the salt should exceed the level of the water in the brine tank and salt particles should always be visible Water level Description Name 1 Salt content lower than water level add salt 2...

Page 18: ...ated regularly the actual product may differ from the instructions Note As the pressure in the water pipe fluctuates the water pressure is generally higher at night than during the day it is advisable...

Page 19: ...ation of the valve to end the current operating status prematurely and move on to the next operating option If for example the hardness of the outlet water is unsuitable press the button after unlocki...

Page 20: ...e 00 00 23 59 Unit of water m Cannot be changed Regeneration time 2 00 00 00 23 59 Maximum regenera tion days 30 0 99 If the set time has elapsed and the re maining water produc tion has not reached t...

Page 21: ...played as shown in Fig F During a quick rinse the menu is displayed as shown in Fig G When the valve rotates from one operating position to another the menu is displayed as shown in Fig H If there is...

Page 22: ...of the control valve This means that different operating modes have different setting menus The description of the set ting lines of the unlabelled operating modes is displayed in all operating modes...

Page 23: ...o longer be excreted after heating there fore also referred to as permanent hardness Testing the raw water hardness Immerse the reaction zone of the hardness test paper in the liquid to be tested for...

Page 24: ...ss the setting button again the minute number 00 flashes Press the up or down button to set the number of minutes 4 Press the setting button again to permanently change the regeneration start time and...

Page 25: ...1 Poor raw water quality 1 Contact a specialist 2 Too long a regeneration time 2 Re initialise regeneration time 3 Leakage of the water mixing valve or excessive opening of water mixing valve 3 Close...

Page 26: ...nd adjust electrical service No display on front panel 1 Wiring of front panel with con troller fails to work 1 Check and replace wiring 2 Front panel damaged 2 Replace front panel 3 Control board dam...

Page 27: ...other European countries with a separate waste collection system for these devices The symbol on the packaging or the product itself indi cates that this product must not be treated as normal domestic...