background image

If you have any questions concerning these instructions, please call National Customer Service 

800.482.1717

.

 

Assembly Instruction

 

1610 Royal Street

 

Jasper, Indiana  47546 

 

 

Telephone 800.482.1717

 

Fax 812.482.8800

 

www.NationalOfficeFurniture.com

 

 

3248959

 

Rev, B

 

 

 

LOCHLYN

 

FREESTANDING FRAME 

BUILD

 

2

 

TOOLS REQUIRED

 

IMPACT DRIVER OR DRILL DRIVER

 

#2 PHILLIPS BIT

 

 

TOOLS REQ. (FLOOR ANCHORING)

 

HAMMER DRILL

 

DRILL DRIVER

 

 

TOOLS REQ. (WALL ANCHORING)

 

IMPACT DRIVER OR DRILL DRIVER 

9/64” 

DRILL BIT

 

 

HARDWARE

 

M4 X 12MM THREAD FORMING 
SCREWS

   

 

 

QTY VARIES BY MODEL

 

 

JUNCTION BLOCKS

 

 

QTY VARIES BY MODEL

 

 

PLASTIC CAPS

 

 

QTY VARIES BY MODEL

 

 

HARDWARE (FLOOR ANCHORING)

 

SEE PG. 8 FOR RECOMMENDATIONS

 

 

HARDWARE (WALL ANCHORING)

 

M4 X 12MM THREAD FORMING 
SCREWS

 

 

QTY VARIES BY MODEL

 

 

STEEL 90 DEGREE BRACKETS

 

 

QTY VARIES BY MODEL

 

 

3/16” 

11”  

FLAT NYLON STRAP

 

 

QTY VARIES BY MODEL

 

 

SEE PG. 10 FOR WALL FASTENER 
RECOMMENDATIONS

 

1

 

Unpack frame sub

-

assembly sections and spread out for access and identification in 

the later steps of assembly 

(Figure A). 

 

Model Assembly Instruction Sheet 

(“

Model AI Sheet

”) 

includes frame dimension references and parts list for 
specific model.

 

 

2

 

Select a frame sub

-

assembly and move to work area. 

Lay the assembly horizontally on the worksurface. Note 

the 3

-

hole pattern features 

(Figure B)

 at the different levels. 

Retrieve the junction blocks 

(Figure C) 

and position one at 

each 3

-

hole pattern so that the protruding features (bosses) 

engage the upper and lower hole of each pattern (

Figure D

). 

The protruding (boss) features will be a press fit into the 
holes.

 

 

FIGURE  B

 

3

 

Retrieve the pack of screws from the hardware 
kit. At each junction block, start and tighten a 

screw through the cavity in the junction block 

(Figure 

D) 

and into the frame. This will secure the block to the 

vertical frame section.

 

 

 

CAUTION:

 

An impact driver may be used but 

excessive driving can strip the threads in the frame. 
Stop driving immediately after there

s audible impacts 

to avoid stripping the screws.  If a drill driver is used, a 
lower clutch setting should be used to avoid stripping 
the screws.

 

FIGURE A

 

FIGURE C

 

FIGURE D

 

bosses

 

Summary of Contents for LOCHLYN

Page 1: ...instructions before using this product Failure to follow the instructions and safety precautions in this manual can result in injury or damage to equipment KEEP THIS MANUAL IN A SAFE PLACE FOR FUTURE...

Page 2: ...ss and identification in the later steps of assembly Figure A Model Assembly Instruction Sheet Model AI Sheet includes frame dimension references and parts list for specific model 2Select a frame sub...

Page 3: ...s noted in step 3 There shouldn t be any remaining junction blocks from the hardware bag or open 3 hole patterns after these steps are complete Figure G 6Retrieve the Model AI Sheet with image of asse...

Page 4: ...re are different length horizontal bars from one column to the next Reference the Model AI Sheet to determine which length bar is correct CAUTION Do not deviate from the provided Model AI Sheet and in...

Page 5: ...evels until all junction blocks are fully secured to the horizontal bars of the frame The vertical sub assembly should be flush with the horizontal bars of the frame Figure K Note While assistance is...

Page 6: ...their midpoint CAUTION Do not extend glides beyond 13mm 0 5in from the glide s fully retracted position Extending glides more than 13mm 0 5 in can make the shelving unit unstable If installing a one 1...

Page 7: ...drawers above three 3 tiers can lead to instability and injury from unit tipping over Floor Anchoring Method All frames will have at least four 4 anchor plates mounted to the floor glides on both end...

Page 8: ...impact of required anchors align the anchor plate in line and directly underneath the cross bar of the sub assembly frame section that runs front to back A bolt is required in this scenario as there i...

Page 9: ...studs must be C channel 20 gauge thick minimum Metal or wood studs must be on centers no greater than 24 and have maximum height of 14 restrained at floor and ceiling Interior walls shall be designed...

Page 10: ...Reference fastener table Figure V for recommended hardware for various wall construction types Select the hardware and install to the wall using all of the wall anchors provided following the next ste...

Page 11: ...tionalOfficeFurniture com 3248959 Rev B LOCHLYN FREESTANDING FRAME BUILD 11 W4Mark the wall to locate the wall brackets vertically in line with the frame tubing or horizontally where necessary to reac...

Page 12: ...nal installation position so all mounting brackets are in line vertically or horizontally based on required installation orientation Check that the frame is still level and wall anchor brackets align...

Reviews: