background image

FP-AI-102 and cFP-AI-102

6

ni.com

Figure 5 show how to connect a voltage source with an external 
power supply to one channel of the [c]FP-AI-102.

Figure 5.  

Voltage Source with External Power Supply

Status Indicators

The [c]FP-AI-102 has two green status LEDs, 

POWER

 and 

READY

. After you insert the [c]FP-AI-102 into a terminal base or 

backplane and apply power to the connected network module, the 
green 

POWER

 indicator lights and the [c]FP-AI-102 informs the 

network module of its presence. When the network module 
recognizes the [c]FP-AI-102, it sends initial configuration 
information to the [c]FP-AI-102. After the [c]FP-AI-102 receives 
this initial information, the green 

READY

 indicator lights and the 

module is in normal operating mode.

Upgrading the FieldPoint Firmware

You may need to upgrade the FieldPoint firmware when you add 
new I/O modules to the FieldPoint system. For information on 
determining which firmware you need and how to upgrade, go to 

ni.com/info

 and enter 

fpmatrix

.

V

sup

V

in

V

C

To Analog

Input Circuitry

To Next

Channel

1.0 M

Input
Impedance

COM

[c]FP-AI-102

Powered

Voltage

Transducer

OUT

+

External

Power

Supply

+

Summary of Contents for FP-AI-102

Page 1: ...l Instruments FP AI 102 Manual Get Pricing Availability at ApexWaves com Call Today 1 800 915 6216 Email sales apexwaves com https www apexwaves com modular systems national instruments fieldpoint FP...

Page 2: ...referred to inclusively as the c FP AI 102 For information about configuring and accessing the c FP AI 102 over a network refer to the user manual for the FieldPoint network module you are using Feat...

Page 3: ...cFP BP x Hot plug and play enables you to install the cFP AI 102 onto a powered backplane without disturbing the operation of other modules or connector blocks The cFP AI 102 receives operating power...

Page 4: ...nd for an external supply to power field devices The cFP CB x connector blocks provide the same connections for the cFP AI 102 Table 1 lists the terminal assignments for the signals associated with ea...

Page 5: ...or connector block Field devices source power from the Vsup and COM terminals Refer to the following section for detailed wiring diagrams Caution Cascading power between two modules defeats isolation...

Page 6: ...2 Analog Input Circuit One Channel The input ranges for voltage signals are 0 20 0 60 0 120 20 60 and 120 V Connect the positive lead of a voltage source to the Vin terminal and the negative lead to t...

Page 7: ...odule of its presence When the network module recognizes the c FP AI 102 it sends initial configuration information to the c FP AI 102 After the c FP AI 102 receives this initial information the green...

Page 8: ...ts that can be at hazardous potentials under normal conditions unless the product is specifically designed for such an application as is the c FP AI 102 Even though the c FP AI 102 is designed to hand...

Page 9: ...ow Pollution Degree 2 Pollution Degree 2 means that only nonconductive pollution occurs in most cases Occasionally however a temporary conductivity caused by condensation must be expected Do not opera...

Page 10: ...102 115 g 4 0 oz Power Requirements Power from network module 400 mW Isolation Voltage Maximum isolation voltage 250 Vrms Installation Category II Channel to channel isolation No isolation between cha...

Page 11: ...3 ms half sine 3 shocks 30 g 11 ms half sine 3 shocks Operating vibration random IEC 60068 2 34 FP AI 102 10 500 Hz 2 2 grms cFP AI 102 10 500 Hz 5 grms Operating vibration sinusoidal IEC 60068 2 6 c...

Page 12: ...tion of Conformity DoC for this product for any additional regulatory compliance information To obtain the DoC for this product click Declaration of Conformity at ni com hardref nsf Mechanical Dimensi...

Page 13: ...6 Austria 0662 45 79 90 0 Belgium 02 757 00 20 Brazil 55 11 3262 3599 Canada Calgary 403 274 9391 Canada Montreal 514 288 5722 Canada Ottawa 613 233 5949 Canada Qu bec 514 694 8521 Canada Toronto 905...

Reviews: