FP-DI-330
2
www.natinst.com
the operation of other modules or terminal bases. The FP-DI-330
receives operating power from the terminal base.
To install the FP-DI-330, refer to Figure 1 and follow these steps:
1. Slide the terminal base key to either position X (used for any
module) or position 3 (used for the FP-DI-330 module.)
2. Align the FP-DI-330 alignment slots with the guide rails on the
terminal base.
3. Press firmly to seat the FP-DI-330 on the terminal base. The
terminal base latch locks the FP-DI-330 into place when it is
firmly seated.
Figure 1.
Module Installation Diagram
Field Wiring
The terminal base provides connections for each of the eight input
channels and an external supply to power field devices. Each
channel can be wired for use with either a sourcing or sinking
output device, or to sense whether power is being delivered to a
load. Figure 2 shows examples of these basic wiring connections.
The connection of an external supply to power field devices is
made to the V and C terminals of the terminal base. Each channel
has two input terminals, INa and INb; a common terminal, COM
(internally connected to the C terminal); and a supply terminal,
V
sup
(internally connected to the V terminal).
Alignment
Slot
Key
Latch
Guide Rails
Terminal Base
I/O Module