National Instruments FieldPoint FP-2000 Quick Start Manual Download Page 13

I. On the

Servers

tab, enter a value

for the

Time Server

, which is the

address of the host computer that
runs the National Instruments
Time Service (installed with
Lookout 4.x, FieldPoint 2.x and 3.x,
or LabVIEW DSC.).

J. Click on

OK

and click

Yes

when

prompted to restart the
FP-2000/2010.

K. Highlight the FP-2000/2010

and click the

Select

button.

13

322759b.qxd  7/26/01  9:52 AM  Page 13

Summary of Contents for FieldPoint FP-2000

Page 1: ...rail clip Network Module Mounting Hardware DIN rail or panel mount accessory Terminal Base s I O Module s Power Supply Accessories Ethernet cable screwdriver PC running Windows FieldPoint Software CD...

Page 2: ...der separately onto module Panel Mount DIN Rail Mount NOTE Do not use spliced DIN rails Use only a single DIN rail C Slide module into position and lock rail clip C Lock rail clip D Use template that...

Page 3: ...minal bases while power is applied to the network module 2 DIN Rail Mount A Unlock rail clip B Press base onto rail Panel Mount A Use template that came with your accessory to drill pilot holes B Conn...

Page 4: ...E Place protective cover on last base and install rail locks at each end C Slide into position and lock the rail clip Be careful not to bend any pins D Repeat for each terminal base up to nine for ea...

Page 5: ...and C terminals those modules should be grouped together For more accurate measurements you might want to locate any thermocouple modules away from heat sources including network modules or relay modu...

Page 6: ...rements B Connect power to the FieldPoint modules that require external power for outputs output modules counter modules PWM PG QUAD Refer to the I O module s operating instructions for power requirem...

Page 7: ...s 1516 V 31 32 C V 1 3 2 C 17 18 CAUTION Cascading power defeats isolation Shades of gray indicate different voltage potentials Separate Power Supply Recommended Cascaded Power Reduces Isolation FP 20...

Page 8: ...e label to help you connect your field devices FP AI 110 Self Powered Floating Sensor 15 32 Loop Powered Sensor 17 2 ISensor Channel 0 VSensor Channel 7 To Power Supply NOTE Either the self powered se...

Page 9: ...0 is ready to be configured If the STATUS LED turns off and the A B C and D LEDs come on the FP 2000 2010 has been configured and LabVIEW RT is starting up If the LEDs do not follow this sequence refe...

Page 10: ...ftware B Insert the FieldPoint software CD and follow the onscreen instructions 9 Configure the FP 2000 2010 Refer to the FP 2000 2010 User Manual for more information about configuration settings A S...

Page 11: ...source Configuration dialog box select Ethernet as the Type E Click Browse to launch Remote System Explorer F Double click the serial number of the FP 2000 2010 to configure it 11 322759b qxd 7 26 01...

Page 12: ...ss of the FP 2000 2010 on the network Subnet mask is the code that one device uses to determine whether another device is on the same subnet 255 255 255 0 is the most common H On the System tab you ca...

Page 13: ...computer that runs the National Instruments Time Service installed with Lookout 4 x FieldPoint 2 x and 3 x or LabVIEW DSC J Click on OK and click Yes when prompted to restart the FP 2000 2010 K Highli...

Page 14: ...heck the cable and connections and make sure the modules are all powered on If you still have problems refer to your FP 2000 2010 User Manual for troubleshooting information C Select an input module a...

Page 15: ...C Select the type of channel to show then select the channel s that you want to change To select more than one channel uncheck the One channel at a time box NOTE Configuration options are module depen...

Page 16: ...when you are finished or click on the Apply button to save the changes and continue to configure channels When you click on OK or Apply the changes are immediately sent to the device I Select File Sav...

Page 17: ...tonegotiated Maximum cabling distance 100 m segment Power supply range 12 to 30 VDC Power consumption 4 5 W 1 1 I O module power requirements Maximum terminal bases per bank 9 Maximum number of banks...

Page 18: ...tibility CE C Tick and FCC Part 15 Class A Compliant Electrical emissions EN 55011 Class A at 10 m FCC Part 15A above 1 GHz Electrical immunity Evaluated to EN 61326 1997 A1 1998 Table 1 NOTE For full...

Page 19: ...109 5 4 31 91 44 3 60 107 19 4 22 Mechanical Dimensions Dimensions are given in millimeters inches 19 322759b qxd 7 26 01 9 52 AM Page 19...

Page 20: ...y 02 413091 Japan 03 5472 2970 Korea 02 596 7456 Malaysia 603 9596711 Mexico 5 280 7625 Netherlands 0348 433466 New Zealand 09 914 0488 Norway 32 27 73 00 Poland 0 22 528 94 06 Portugal 351 1 726 9011...

Reviews: