![National Crane 600H Service Manual Download Page 71](http://html1.mh-extra.com/html/national-crane/600h/600h_service-manual_3360637071.webp)
10
3
NATIONAL CRANE
08-19-2022 Control # 092-13
3-17
600H ELECTRIC
SYSTEM
The connector on the end of the cable will hook up to
antenna connector on receiver. See Figure 3-6.
NOTE:
Regarding Antenna Placement; Place antenna in
an open area, at least 18 inches (45.7 cm) from any
vertical metal. The position of a “Boom” (over or
around) can effect the antenna’s ability to receive a
signal, creating “Dead Spots”.
Cut
FIGURE 3-9
T
ruck Sole
noid
-Cu
t existing ignition
wir
e
and
st
rip
ends 0.25
in
ch
-Co
nnect
these two
wires as shown
on sch
ematic
T
ruck Ignition
Sw
it
c
h
Neutral S
a
fety Switch
T
ruck Cab
(B
e
fore Remote
In
stallation)
Cl
u
tch
Switc
h
Solenoid S
ide
Start
Ignition
OP
TION GROUP
(Rem
ote
Co
ntro
l Eng
ine
Co
mpa
rt
m
en
t wirin
g
D
iagram
)
sheet
1
Switch Si
d
e
REFERENCE ONLY
Summary of Contents for 600H
Page 1: ...Service Manual National Crane 600H R E F E R E N C E O N L Y...
Page 6: ...THIS PAGE BLANK R E F E R E N C E O N L Y...
Page 136: ...BOOM 600H SERVICE MANUAL 4 62 08 19 2022 Control 092 13 R E F E R E N C E O N L Y...
Page 231: ...R E F E R E N C E O N L Y...
Page 232: ...R E F E R E N C E O N L Y...