PAGE: 35
11.
TURN THE LINE VOLTAGE BACK ON TO THE SUPER-E.
10.
REMOVE THE SMALL ROUND BRASS PLUG FROM THE GAS VALVE BY TURNING IT COUNTER-CLOCKWISE WITH A
SMALL PUNCH AND HAMMER.
7.
RE-CONNECT THE SUPPLY GAS PIPING TO THE VALVE.
8.
TURN ON THE GAS TO THE SUPER-E.
9.
TURN THE BLUE KNOB ON THE GAS VALVE TO "ON".
6.
CONNECT THE VACUUM HOSE ACCORDING TO THE FOLLOWING DIAGRAM:
Summary of Contents for ANSI Z 21.10.3
Page 2: ...PAGE 2 ...
Page 12: ...PAGE 12 ...
Page 15: ...PAGE 15 ...
Page 16: ...PAGE 16 ...
Page 17: ...PAGE 17 ...
Page 18: ...PAGE 18 ...
Page 19: ...PAGE 19 ...
Page 21: ...PAGE 21 Figure 3 A Direct Vent Terminal Clearances per ANSI Z21 10 3 2004 CSA 4 3 2004 ...
Page 22: ...PAGE 22 ...
Page 23: ...PAGE 23 ...
Page 24: ...PAGE 24 ...
Page 25: ...PAGE 25 ...
Page 26: ...PAGE 26 ...
Page 30: ...PAGE 30 PARTS ILLUSTRATIONS ...
Page 40: ...PAGE 40 ...