2
W415-0527 / A / 04.14.11
NOTE: Changes, other than editorial, are denoted by a vertical line in the margin
TABLE OF CONTENTS
1.0 INSTALLATION OVERVIEW
1.0 INSTALLATION
OVERVIEW
2
2.0 INTRODUCTION
3
2.1 DIMENSIONS
4
2.1.1 ZCVF36
4
2.1.2 ZCVF42
4
2.2
GAS INLET LOCATIONS
5
2.2.1 ZCVF36
5
2.2.2 ZCVF42
5
2.3 GENERAL
INSTRUCTIONS
6
2.4
RATING PLATE INFORMATION
6
3.0 FRAMING
7
3.1
MINIMUM CLEARANCE TO COMBUSTIBLES
8
3.1.1 ZCVF36
8
3.1.2 ZCVF42
8
3.2
MINIMUM MANTEL CLEARANCES
9
3.3 NAILING
TAB
INSTALLATION
9
4.0 FINISHING
10
4.1 HOOD
INSTALLATION
10
5.0
OPTIONAL BLOWER INSTALLATION
11
6.0 REPLACEMENTS
13
7.0 WARRANTY
14
8.0 SERVICE
HISTORY
15
FOR USE ONLY WITH A ANSI Z21.11.2 LISTED GAS-FIRED UNVENTED ROOM HEATER NOT TO
EXCEED 40,000 BTU/H
FOLLOW THE INSTRUCTIONS, AND COMPLETE THE INSTALLATION OF THE UNVENTED ROOM
HEATER.
Carefully review the instructions supplied with the unvented room heater for the mimimun fi rebox
size requirement.
DO NOT INSTALL AN APPLIANCE IN THIS FIREBOX UNLESS THIS FIREBOX MEETS THE MINIMUM
DIMENSIONS REQUIRED FOR THE INSTALLATION.
Hood, see “HOOD
INSTALLATION” section.
Gas inlet, see “GAS INLET
LOCATIONS” section.
Gas inlet, see “GAS INLET
LOCATIONS” section.