
23
WS-415-091 / 06.26.00
Do not overtighten thermodisc or distort housing.
Attach
the connectors from the black and white wires to the
thermodisc.
Attach the connectors from the
black and red wires to the
blower. Attach and secure the
variable speed switch using the
nut provided. Plug the harness
cord into the receptacle.
The wire harness provided in this kit is a universal har-
ness. When installed, ensure that any excess wire is
contained, preventing it from making contact with mov-
ing or hot objects.
Drywall dust will penetrate into the blower bearings,
causing irreparable damage. Care must be taken to
prevent drywall dust from coming into contact with the
blower or its compartment. Any damage resulting from
this condition is not covered by the warranty policy.
Because the blower is thermally activated, when turned
on, it will automatically start approximately 10 minutes
after lighting the fireplace and will run for approximately
30 - 45 minutes after the fireplace has been turned off.
Use of the fan increases the output of heat.
The blower bracket contains slots that allow the blower to
be positioned away from the intended gas supply hole.
Secure the blower using the lock washers and wing nuts
provided.
Remove the thermodisc
from the "Z" shaped mount-
ing bracket and re-attach to
the bracket supplied in the
burner kit. This bracket is
found secured to the pilot
housing behind the variable
speed / piezo ignitor
bracket.
INSTALLATION TO BE DONE BY A QUALIFIED IN-
STALLER
and must be electrically connected and grounded
in accordance with local codes. In the absence of local
codes, use the current CSA C22.1 C
ANADIAN
ELECTRICAL
CODE
in Canada or the ANSI/NFPA 70-1996
NATIONAL
ELECTRICAL
CODE
in the United States.
Remove the
blower from its
mounting bracket
and attach to the
bracket supplied
with the fireplace.
This bracket is
found secured on
the mounting
studs located at
the bottom of the
vent side wall.
red
white
black
OPTIONAL BLOWER INSTALLATION
Position the vibration reducing pad, centred, onto the 2
threaded studs, piercing 2 holes into the pad. The blower
must be able to be positioned entirely onto the pad.
Tilt the blower onto its side and slide it past the controls.
Position the blower onto the studs.
O
IH
FF
O
N
LO
P L
O
T
I
PILOT
FIGURE 46
FIGURE 43
FIGURE 45
FIGURE 47
O
IH
FF
O
N
LO
P L
O
T
I
P I LO T
FIGURE 48
FIGURE 49
FIGURE 44