![Napoleon GD19-1N Installation And Operating Instructions Manual Download Page 25](http://html1.mh-extra.com/html/napoleon/gd19-1n/gd19-1n_installation-and-operating-instructions-manual_4102331025.webp)
W415-1351 / 08.29.14
25
EN
4.2.2 VERTICAL AIR TERMINAL INSTALLATION
A.
Fasten the roof support to the roof using the screws provided. The
roof support is optional. In this case the venting is to be adequately
supported using either an alternate method suitable to the authority
having jurisdiction or the optional roof support.
B.
Stretch the inner
fl
ex pipe to the required length. Slip the
inner
fl
ex pipe a minimum of 2” (51mm) over the inner pipe
of the air terminal connector and secure with 3 #8 screws.
Seal using a heavy bead of high temperature sealant
W573-0007 (not supplied).
C.
Repeat using the outer
fl
ex pipe, using a heavy bead of
high temperature sealant W573-0002 (not supplied).
D.
Thread the air terminal connector / vent pipe assembly down through
the roof. The air terminal must be positioned vertically and plumb.
Attach the air terminal connector to the roof support, ensuring that the
top of the air terminal is 16” (406mm) above the highest point that it
penetrates the roof.
E.
Remove nails from the shingles, above and to the sides of the air
terminal connector. Place the
fl
ashing over the air terminal connector
leaving a min. 3/4” (19mm) of the air terminal connector showing
above the top of the
fl
ashing. Slide the
fl
ashing underneath the
sides and upper edge of the shingles. Ensure that the air terminal
connector is properly centred within the
fl
ashing, giving a 3/4”
(19mm) margin all around. Fasten to the roof. Do not nail through
the lower portion of the
fl
ashing. Make weather-tight by sealing with
caulking. Where possible, cover the sides and top edges of the
fl
ashing with roo
fi
ng material.
F.
Aligning the seams of the terminal and air terminal connector,
place the terminal over the air terminal connector making sure
the vent pipe goes into the hole in the terminal. Secure with
the three screws provided.
G.
Apply a heavy bead of weatherproof caulking 2” (51mm) above
the
fl
ashing. Install the storm collar around the air terminal and
slide down to the caulking. Tighten to ensure that a weather-
tight seal between the air terminal and the collar is achieved.
H.
If more vent pipe needs to be used to reach the appliance see “HORIZONTAL
AIR TERMINAL INSTALLATION” section.
24.1A
STORM COLLAR
FLASHING
CAULKING
WEATHER
SEALANT
2” (51mm)
AIR INLET
BASE
ROOF SUPPORT
INNER FLEX PIPE
INNER PIPE
HIGH
TEMPERATURE
SEALANT
AIR
TERMINAL
CONNECTOR
OUTER FLEX PIPE
MAINTAIN A MINIMUM 2” (51mm) SPACE BETWEEN THE AIR INLET BASE AND THE STORM COLLAR.
!
WARNING
Summary of Contents for GD19-1N
Page 40: ...W415 1351 08 29 14 40 EN SCREEN SAFETY SAFETY SCREEN FIG 4...
Page 62: ...W415 1351 08 29 14 62 EN 43 1 22 0 SERVICE HISTORY...
Page 63: ...W415 1351 08 29 14 63 EN 44 1 23 0 NOTES...
Page 105: ...FR W415 1351 09 02 14 105 PROTECTION CRAN DE CRAN DE PROTECTION FIG 4...