W415-1739 / C / 08.03.17
EN
20
finish framing - after appliance installation
see-thru built out
Ref
LV38-1
LV50-2
LV62
LV74
E
16 3/16” (41.1cm)
16 3/16” (41.1cm)
16 3/16” (41.1cm)
16 3/16” (41.1cm)
N* / **
14 1/4” (36.2m)
14 1/4” (36.2m)
14 1/4” (36.2m)
14 1/4” (36.2m)
O*
25 11/16 (65.2cm)
25 11/16 (65.2cm)
25 11/16 (65.2cm)
25 11/16 (65.2cm)
P*
4” (10.1cm) Max
4” (10.1cm) Max
4” (10.1cm) Max
4” (10.1cm) Max
N
O
P
* Thickness of finishing material
must
be considered when constructing the framing for the protrusion (i.e. Dimen-
sions such as N, O, & P includes framing and finish material). If desired, side and bottom protrusions are also
permitted with 4” (10.1cm) Max. (finishing material not illustrated)
minimum framing
E
Finish framing
must
be built
after appliance has been
placed in its final position and
venting connected.
When finished,
protrusions must never encroach inside the appliance finishing flange
as this will impede
the fitment of the safety barrier and safe operation. See “finishing” section in the installation manual.
note:
note:
Insulation
Drywall
** This is a recommended dimension when mounting electronics above the appliance. Otherwise, it can be as
minimal as construction permits.
Option 2 illustrated (appliance
not shown)