18
W415-0221 / E / 04.09.02
NAILING
TAB
NAILING TAB INSTALLATION
1)
Attach the nailing tabs to the corner
posts using the 2 sheet metal screws
supplied. Secure through the centre of
the top and bottom slots in the nailing
tab and then through the existing holes
in the corner posts.
If there are no existing holes, follow
these instructions:
Position the nailing tab so that the front
face is offset with the front edge of the
corner post (approx. ½"). Centre the
nailing tab vertically on the corner post.
Figure 34 a.
Drill through the centre of the top and
bottom slots in the nailing tab. Secure using
the two sheet metal screws supplied. This allows
the nailing tab to slide back and forth for desired framing.
Figure 34 b.
2)
To determine the final location of the nailing tab you
must first determine the thickness of your finishing mate-
rial (i.e. drywall). This will determine the dimension from
the front edge of the corner post to the nailing tab. Once
the nailing tab is in the desired location, drill through the
centre hole of the nailing tab. Secure with a sheet metal
screw*.
Figure 34 c.
*
Additional set screws may be installed
.
FIGURES 35
Combustible mantle clearance can vary according to the
mantle depth.
FIGURE 35.
Use the graph to help evaluate
the clearance needed. Curtains, above the fireplace, must
not be positioned lower than the 5" distance required for
the 2" combustible mantle.
These same requirements
apply to any combustibles protruding on either side of
the fireplace.
FIGURES 34a-c
TOP
SLOT
FINISHING
MATERIAL
CORNER
POST
NAILING
TAB
A
B
C
CENTRE
HOLE