26
W415-0777 / 03.02.09
4.1 NAILING TAB INSTALLATION
NAILING TAB
CORNER POST
NAILING TAB
CENTRE HOLE
FINISHING
MATERIAL
TOP SLOT
55.1
Attach the nailing tabs to the
•
corner posts using the 2 sheet
metal screws supplied. Secure
through the centre of the top
and bottom slots in the nailing
tab and then through the exist-
ing holes in the corner posts.
If there are no existing holes,
follow these instructions:
Position the nailing tab so that
•
the front face is offset with the
front edge of the corner post
(approx. ½”). Centre the nailing
tab vertically on the corner post.
Drill through the centre of the
•
top and bottom slots in the nail-
ing tab. Secure using the two
sheet metal screws supplied.
This allows the nailing tab to slide
back and forth for desired framing.
To determine the
fi
nal location of the nailing tab you
•
must
fi
rst determine the thickness of your
fi
nish-
ing material (i.e. drywall). This will determine the
dimension from the front edge of the corner post
to the nailing tab. Once the nailing tab is in the desired location, drill through the centre hole of the nailing
tab. Secure with a sheet metal screw*.
* Additional set screws may be installed.
4.2 MINIMUM MANTEL CLEARANCES
Combustible mantel clearance can vary according to the mantel depth. Use the graph to help evaluate the
clearance needed. Curtains, above the appliance, must not be positioned lower than the 5" distance required
for the 2" combustible mantel. These same requirements apply to any combustibles protruding on either side
of the appliance.
!
WARNING
Risk of fire, maintain all specified air space clearances to combustibles. Failure to comply with
these instructions may cause a fire or cause the appliance to overheat. Ensure all clearances (i.e.
back, side, top, vent, hearth, mantel, front, etc.) are clearly maintained.
When using paint or lacquer to finish the mantel, the paint or lacquer must be heat resistant to
prevent discolouration.
FIGURE 4.1a
FIGURE 4.1b
FIGURE 4.1c
FIGURE 4.2
4.1.1
4.1.2
4.1.3
4.1.4