W415-1239 / A / 03.21.14
15
IOM
7.2 ACCEPTABLE MATERIALS IN UNITED STATES
7.0 VENTING AND COMBUSTION PIPING
7.1 ACCEPTABLE MATERIALS IN CANADA
H3.10
READ, UNDERSTAND AND FOLLOW ALL INSTRUCTIONS IN THIS SECTION. FAILURE TO
PROPERLY VENT OR SUPPLY COMBUSTION AIR TO THIS FURNACE CAN CAUSE CAR-
BON MONOXIDE POISONING, OR AN EXPLOSION OR FIRE, RESULTING IN PROPERTY
DAMAGE, PERSONAL INJURY OR LOSS OF LIFE.
WARNING
!
!
H11.1
Effective August 1, 2007, all vent piping materials and
fi
ttings for
fl
ue gas venting must be ULC S636 listed
and identi
fi
ed as such on the material. The
fi
rst 3ft. (900mm) of venting must be readily available for visual
inspection. Speci
fi
ed primers and glues of the certi
fi
ed vent system must be from a single system manufacture,
and not intermixed with other system manufacture’s vent system parts. The components of the certi
fi
ed vent
system must not be interchanged with other vent systems, or unlisted pipe, and or
fi
ttings. Follow the venting
manufacturers instructions on installation, cutting, de-burring, cementing, curing and supporting of the venting
system.
This furnace must be vented with ULC S636 certi
fi
ed:
•
PVC
(Polyvinyl
Chloride),
OR
• PPE (Polypropolene) material
with a rating of 149°F (65ºC) or more.
The combustion air piping does not have
fl
ue gases travelling through it and may be installed with common
ABS, PVC or CPVC piping or
fi
ttings. This piping,
fi
ttings, primer and cement will need to be installed as per
the manufacturers instructions including cementing, cutting, curing and supporting the piping.
H11.2
For United States installations, the combustion air and vent piping and
fi
ttings may be comprised of:
•
Schedule 40 PVC, ASTM D1785 or CSA B137.3
•
PVC-DWV, ASTM D2665 or CSA B181.2
•
Schedule 40 CPVC, ASTM F441 or CSA B137.6
•
PVC PRIMER AND SOLVENT CEMENT: ASTM D2564
•
PPE ULC S636
Follow piping manufacturers instructions on proper installation of piping and
fi
ttings including cutting, deburring,
priming, cementing, curing and supporting.
Summary of Contents for 9500-B Series
Page 27: ...W415 1239 A 03 21 14 27 IOM FIGURE 14A DIRECT VENT TERMINAL CLEARANCES...
Page 28: ...W415 1239 A 03 21 14 28 IOM IOM FIGURE 14B NON DIRECT VENT TERMINAL CLEARANCES...
Page 57: ...W415 1239 A 03 21 14 57 IOM 23 0 SERVICE HISTORY 43 1...
Page 58: ...W415 1239 A 03 21 14 58 IOM IOM 24 0 NOTES 44 1...
Page 74: ...6 0 NOTES 44 1 W415 1239 A 03 21 14 UM 74...