background image

Installation Guide Modbus E5000 IAQ probe 

 

page 7/8 

The start-up cycle includes built in tests and visual checks of LEDs. 
 
The cycle lasts about 

one minute

 in total. 

 
LEDs indicate faults as follows: 
 
 
 
 
 
 
 
 

LED code on the front panel 

Identification #  

Defective FRU 

No LED active 

NA 

Power supply failure suspected or 
probe power supply board 

Red LED on for 5 seconds 

 

 

Followed by a yellow flash 

Front panel board.

 

Followed by 2 yellow flashes

 

Single band CO2 sensor module. 

Followed by 3 yellow flashes

 

Dual band CO2 sensor module 

Followed by 4 yellow flashes

 

VOC sensor module 

Followed by 5 yellow flashes

 

Motherboard 

Followed by 6 yellow flashes

 

Interconnection board 

Followed by 7 yellow flashes

 

Particle sensor board 

Followed by 8 yellow flashes

 

Power supply board 

Red LED blinking  

Multiple failures 

Alternation Red Blue 

10 

Perishable sensor reaching the end 
of life. 

All LEDs blinking

 

11 

No communication between front 
panel and probe. (after 30 seconds) 

 

10. Commissioning 

The NFC is used for commissioning (See commissioning and App manuals) 
 
 

11. Removing the front panel of an installed probe 

There are 4 side recess. 
 
Insert a small screwdriver head horizontally by 1mm into one recess avoiding to 
damage the wall. 
 
Pull the front panel 2mm from the wall and push the screw driver deeper. (between 2 
plastic parts) 
 
Move the screwdriver towards the middle of the side until the front panel unclips from 
the device. 
 
Be careful not to fall the panel down as the tempered glass may break apart. 
 
 
 

Summary of Contents for enocean EP5000E

Page 1: ... 0 1 41 41 00 02 www nano sense com page 1 8 EP5000E air quality probe Installation manual Ver Date Modification Update V1 16 12 2019 Initial Version V2 23 04 2021 Update V3 09 07 2021 Disassembling the front panel V4 10 10 2021 Add recommendations and warranty ...

Page 2: ...IONING 3 3 DISASSEMBLING THE FRONT PANEL 5 4 FLUSH MOUNTING 5 5 SURFACE BOX MOUNTING RENOVATION 5 6 WIRING 5 7 INSTALLATION 6 8 POWER SUPPLY 6 9 POWER ON 6 10 COMMISSIONING 7 11 REMOVING THE FRONT PANEL OF AN INSTALLED PROBE 7 12 DISCONNECTION 8 13 RECOMMENDATIONS 8 14 WARRANTY 8 ...

Page 3: ...sure air quality it must be placed in the area of occupancy of the premise served by outlet vents on a wall at eyes level breathing human level between 1 5 and 1 8m for WELL V2 compliance and at distance from heater and Air Cond Avoid drafts near openings blowing air doors outlet vents and dead zones niche shelves and curtains 1m from doors ventilation and areas where an occupant can exhale direct...

Page 4: ...ight combine without even taking into account the generally zenithal artificial lighting Consideration should also be given to the receptivity of the light sensor which is mounted vertically similar to our eyes Any work not in accordance with this documentation or changes to the device will invalidate all warranty claims ...

Page 5: ...h of the case must be at least 50mm The internal diameter about 64mm shall have a 40x40mm space free up to the bottom The space between screws shall be 60mm The height of the screws heads shall be 2mm max 5 Surface box mounting renovation Use the specific wall surface box To be ordered separately This box has 4 pre cut cable passages one on each side for wiring under trunking In case of a recessed...

Page 6: ... the terminal block on the back of the product Pay attention to marking Modbus A B and power supply polarity Just push the stripped ends flexible or rigid into the connector In case of a multi strand cable make sure to well twist them before inserting them In case of difficulty push the release tab Respect the polarity non destructive Make sure to respect the Up marking otherwise the temperature a...

Page 7: ... 6 Interconnection board Followed by 7 yellow flashes 7 Particle sensor board Followed by 8 yellow flashes 8 Power supply board Red LED blinking 9 Multiple failures Alternation Red Blue 10 Perishable sensor reaching the end of life All LEDs blinking 11 No communication between front panel and probe after 30 seconds 10 Commissioning The NFC is used for commissioning See commissioning and App manual...

Page 8: ...which it has been subjected This device is guaranteed against any manufacturing or material defect within the limits of the following provisions The warranty is strictly limited to the exchange or repair in the factory of parts recognized as defective after examination and control to the exclusion of any other compensation The warranty period offered by the manufacturer is one year and begins to r...

Reviews: