Installation Guide Modbus E5000 IAQ probe 

 

page 6/8 

When the sealing of the duct is not possible, use a specific sealant without silicone 
and VOC. 
In case of use of electrical backbox, select an airtight case with sealing membrane 
from which the duct passes through. If the case crosses through the sealing plane 
(plasterboard), seal between the casing and panel with a special sealant without 
silicone and VOC. 
 
Connectors are specified for rigid cable 18 to 24 AWG (1 to 0.5mm dia.) or twisted 20 to 22 AWG (0.8 
to 0.65mm dia.) 
The connectors accept two 0.8mm cables on the same terminal in order to chain 
several sensors. Beware of line losses, a 0.8mm cable has a resistance of 21Ω 
per Km. 
 

 
 

 
 

 

7. Installation 

It is recommended to install the probe at the end of the work (after painting and using 
silicone-based products). 
Connect the ModBus and the 24V DC Power Supply pair cables on the terminal 
block on the back of the product. Pay attention to marking: Modbus A & B and 
power supply polarity. 

 

Just push the stripped ends (flexible or rigid) into the connector. In case of a multi-
strand cable, make sure to well twist them before inserting them. In case of 
difficulty, push the release tab. Respect the polarity (non-destructive). 

 

Make sure to respect the Up marking otherwise the temperature and humidity 
measurement will be jammed. 
Screw the plate on the backbox. 
Plug the front panel onto the plate. Pay attention to the position of the connector in 
the back of the front plate. 

 

If well mounted, the transparent window of the light sensor shall be on top middle. 
 
 
 
 
 

8. Power supply 

The power supply must be continuous (DC) and between 12 and 32V (24V nominal). 
 
 

9. Power on 

Few  seconds  after  power-up,  all  LEDs  will  be  activated  individually  for  a  visual 
test. At the end of the cycle, failure message made of blink between orange and red 
LED may appear during few seconds, the time to interrogate all sensors  
 
Then, the blue LED shall "breathes" if the air quality is good enough. 
 

 

 

Summary of Contents for enocean EP5000E

Page 1: ... 0 1 41 41 00 02 www nano sense com page 1 8 EP5000E air quality probe Installation manual Ver Date Modification Update V1 16 12 2019 Initial Version V2 23 04 2021 Update V3 09 07 2021 Disassembling the front panel V4 10 10 2021 Add recommendations and warranty ...

Page 2: ...IONING 3 3 DISASSEMBLING THE FRONT PANEL 5 4 FLUSH MOUNTING 5 5 SURFACE BOX MOUNTING RENOVATION 5 6 WIRING 5 7 INSTALLATION 6 8 POWER SUPPLY 6 9 POWER ON 6 10 COMMISSIONING 7 11 REMOVING THE FRONT PANEL OF AN INSTALLED PROBE 7 12 DISCONNECTION 8 13 RECOMMENDATIONS 8 14 WARRANTY 8 ...

Page 3: ...sure air quality it must be placed in the area of occupancy of the premise served by outlet vents on a wall at eyes level breathing human level between 1 5 and 1 8m for WELL V2 compliance and at distance from heater and Air Cond Avoid drafts near openings blowing air doors outlet vents and dead zones niche shelves and curtains 1m from doors ventilation and areas where an occupant can exhale direct...

Page 4: ...ight combine without even taking into account the generally zenithal artificial lighting Consideration should also be given to the receptivity of the light sensor which is mounted vertically similar to our eyes Any work not in accordance with this documentation or changes to the device will invalidate all warranty claims ...

Page 5: ...h of the case must be at least 50mm The internal diameter about 64mm shall have a 40x40mm space free up to the bottom The space between screws shall be 60mm The height of the screws heads shall be 2mm max 5 Surface box mounting renovation Use the specific wall surface box To be ordered separately This box has 4 pre cut cable passages one on each side for wiring under trunking In case of a recessed...

Page 6: ... the terminal block on the back of the product Pay attention to marking Modbus A B and power supply polarity Just push the stripped ends flexible or rigid into the connector In case of a multi strand cable make sure to well twist them before inserting them In case of difficulty push the release tab Respect the polarity non destructive Make sure to respect the Up marking otherwise the temperature a...

Page 7: ... 6 Interconnection board Followed by 7 yellow flashes 7 Particle sensor board Followed by 8 yellow flashes 8 Power supply board Red LED blinking 9 Multiple failures Alternation Red Blue 10 Perishable sensor reaching the end of life All LEDs blinking 11 No communication between front panel and probe after 30 seconds 10 Commissioning The NFC is used for commissioning See commissioning and App manual...

Page 8: ...which it has been subjected This device is guaranteed against any manufacturing or material defect within the limits of the following provisions The warranty is strictly limited to the exchange or repair in the factory of parts recognized as defective after examination and control to the exclusion of any other compensation The warranty period offered by the manufacturer is one year and begins to r...

Reviews: