NANAWALL WD65 OWNER’S MANUAL
8
Step A7
Anchor the sill to the sub floor in correct relation to the
finish floor. Make sure that the sill is not tilted or twisted.
Make sure that all holes drilled through the sill are
properly sealed with silicone underneath and around
the screws.
All weep holes in the sill are not to be obstructed.
Make any necessary adjustments to level, plumb, and
square before proceeding on.
Step A8
Anchor the side jambs to studs or walls in the same
manner. Make sure that the jambs are plumb and straight.
Step A9
Anchor the head jamb through the pre-drilled holes and
shims. Make sure that the head jamb is level.
IMPORTANT:
Make sure no shims are forced to
ensure that frame sections are not bowed.
Check frame constantly to be certain that it is level,
plumb and square. A transit and other similar
precise measuring equipment should be used to
make these determinations.
Step A10
IMPORTANT:
Make sure that all the surfaces of the
upper and lower tracks are clean and free of any
debris, especially, cuttings from drilled holes.
DIAGRAM 3:
SUGGESTED FRAME FASTENING POINTS
A = About 4
"
from the interior edge.
B = Distance about 16
"
, except at the stacking area on
one or both sides where spacing should be about 4
"
.
Plus extra screws at meeting point of panels.
C = Distance about 14” from the bottom using extra
screw at top.