background image

NANAWALL WD65 OWNER’S MANUAL

• Lever handles, other handles or other entry hardware

as ordered. These may be pre-attached to the panels.

• Panel holder – one for each swing door not attached

to a side jamb.

HANDLING OF COMPONENTS

1.

Upon receipt, inspect the shipment to ensure it is in
good condition.

2. Make sure that the small cardboard box with the

hinge pins and other hardware does not get lost.

3. Store in a clean and dry location and protect against

defacement or damage, especially to the edges of
panels.

4. Wood components should not be subject to extreme

or rapid changes in heat or humidity, such as forced
heating to dry out a building.

5.

All wood surfaces including all edges (top, bottom
and sides) should be completely sealed and finished
promptly.

PREPARATION OF THE ROUGH OPENING 

For necessary clearance and adjustment space, make 
rough opening about 3/4

"

 wider and 3/8

"

- 1

"

 higher than 

the outside frame size of the unit ordered (check to 
comply with applicable codes for maximum shim space 
allowed, especially in high windload areas). It is important 
that the opening be the correct size. Note that the 
outside frame height of the unit ordered is measured 
from the bottom of the sill and not from the finished 
floor. Allowance must be made in height for the portion 
of the sill that is below the measured opening.

IMPORTANT: 

Because of the large opening sizes  

and the weight and movement of the panels, any  
application should take into consideration the following:

1.

The structural integrity of the header is critical for
proper operation. Vertical deflection of the header
under full live and dead loads should be the lesser of
L/720th of the span and 1/4

"

. Structural support for

lateral loads (both windload and when the panels are
stacked open) must also be provided.

2.

A qualified engineer or architect should be used to
determine the proper construction details and header
to be used in your particular application.

3.

THE ROUGH OPENING SHOULD BE LEVEL, PLUMB
AND SQUARE AT ALL POINTS. THERE SHOULD

 

BE

NO UNEVENNESS OR BOWING. MAKE SURE

 

THAT

THE HEADER IS NOT TILTED OR TWISTED.

 

THERE

SHOULD BE NO BUMPS ON THE FLOOR.

 

THE

SIDES SHOULD BE IN THE SAME VERTICAL

 

PLANE

AND NOT OFFSET OF EACH OTHER.

 

A TRANSIT

AND OTHER SIMILAR PRECISE

 

MEASURING

EQUIPMENT SHOULD BE USED.

4.

With a recessed sill, if concrete is to be poured after
the installation of the unit, the sill has to be securely
attached to the construction. If the sill is to be cast

 

in

concrete, then an expansion gap with appropriate
material has to be created next to the sill.

5.

With a low profile saddle sill, some resistance to

 

water

infiltration may be achieved by installing drain
connections to the outside.

If any anchorage or drain connection holes are made 
through these drain channels, make sure that they are 
properly sealed to prevent any water leakage. The open 
ends of these drain channels at each end of the sill 
should also be properly sealed. 

Alternative anchoring 

systems for the sill (without using screws through the 
drain channels) are using L brackets attached to both 
sides of the sill.

Summary of Contents for WD65

Page 1: ...5 Wood Framed Top Hung Folding System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through NanaWal...

Page 2: ...is shipped with all necessary components However not included are screws bolts shims etc to anchor the unit to the rough opening The frame is shipped knocked down and needs to be assembled Panels are...

Page 3: ...e into consideration the following 1 The structural integrity of the header is critical for proper operation Vertical deflection of the header under full live and dead loads should be the lesser of L...

Page 4: ...roof etc be constructed before a unit is installed Properly flash and waterproof around the perimeter of the opening especially at the sill Make sure you seek proper professional advice for the approp...

Page 5: ...stomer s specific application requirements can be evaluated Your local paint professional should know of suitable finish systems that give satisfactory results in your region It is highly recommended...

Page 6: ...ead jamb and sill regarding their length provided in segments then connect them first If a unit has angle changes in the floor plan then separate information will be supplied Make sure that the frame...

Page 7: ...ts Use appropriate screws or other equivalent anchorage devices depending on the adjacent substrate material and construction Make sure they are corrosion resistant Anchorage devices should penetrate...

Page 8: ...the pre drilled holes and shims Make sure that the head jamb is level IMPORTANT Make sure no shims are forced to ensure that frame sections are not bowed Check frame constantly to be certain that it i...

Page 9: ...scale Details shown are subject to change without notice Note Contact us for detailed information OUTWARD OPENING PANEL HINGED AT RIGHT SIDE JAMB INWARD OPENING PANEL HINGED AT RIGHT SIDE JAMB STANDAR...

Page 10: ...eck to make sure that the panel is vertically straight Step B4 If there are additional panels to be attached to the folding pair close the pair by turning the handle 180 Step B5 Attach additional pane...

Page 11: ...ior grade sealant with a backer rod if needed on the joint between the sill and sub floor on both sides along the length of the sill Do similar for the gaps between the head jamb and side jambs with t...

Page 12: ...curity and weather resistance When closed please engage all locking mechanisms fully The correct sequence of opening and closing of panels is dependent on the configuration ordered Panels must be open...

Page 13: ...side or a thumb turn on the inside Unlock and disengaging the locking points Unlock the lock with key or thumb turn By operating the door handle downwards the locking points at the top and the bottom...

Page 14: ...al loading and forced entry 5 Periodically inspect the sealant caulking on the exterior perimeter of the unit It is extremely important that the sealant caulking remains intact and in good condition T...

Page 15: ...jamb tracks should be free from all dirt and debris c There should be no standing water in the track in the sill d All hardware should be intact and operating properly 2 All surfaces must be cleaned w...

Page 16: ...ments of ASTM E 774 Class A B or C Although glass installation with the dry glazing system is relatively straight forward it is recommended that an experienced glazing contractor be used It is very im...

Page 17: ...n the upper rail on the same corner as the other upper setting block To get a proper fit shift the glass weight by lifting the panel up with a plastic pry bar at the lower corner below the upper setti...

Page 18: ...lightly higher in the upper corner with the setting blocks it is okay If not then the lower and upper setting blocks thickness need to be adjusted Panels have to be braced correctly for proper operati...

Page 19: ...antial cracking chipping or peeling due to the deterioration of the finish exclusive of mechanical damage 2 chalking in excess of a numerical rating of 8 as per ASTM D 659 or 3 fading or color changes...

Page 20: ...e of the affected product in full satisfaction of its obligations Wood Wood components must be properly finished on all sides promptly after receipt of unit before installation of unit and prior to ex...

Page 21: ...Product selection application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Instal...

Page 22: ...faces Acts of God falling objects fire accidents external forces or other conditions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performanc...

Page 23: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Reviews: