Other components include:

•   Tubo100, other handles or other hardware, as 

ordered may not be pre-attached to the panels and 
will be in the hardware box or shipped separately.

•  The upper track components consisting of the head 

track in the opening, the stacking route(s) and the 
stacking bay(s) as shown in the layout drawing of 
your unit. The drawing shows how they are labeled 
and how they have to be connected. The joints 
for the segments are indicated and necessary 
connectors for connecting different upper track 
pieces are provided.

•  The removable head track (RHT) portion to insert the 

rollers on panels is indicated on the layout drawing.

•  Side jambs

•  Floor closer

•  Vertical H- and h-gaskets to be cut to size and field 

applied.

•  Parts of the overhead door closer (if any) 

are pre-attached to the top rail.

•  Parts of the overhead door closer (if any) 

are pre-attached to the top rail

•  The locking receiver for the Reverse Tubo200 to be 

installed on the side of the head track will be in the 
hardware box.

 

HANDLING OF COMPONENTS

1.  Upon receipt, inspect the shipment to ensure it is in 

good condition.

2.  Make sure that all components and hardware, which 

might be shipped separately, does not get lost.

3.  Store in a clean and dry location and protect against 

defacement or damage, especially to the edges of 
panels.

 

PREPARATION OF THE OPENING AND SUPPORT 
STRUCTURE ABOVE 

 

Make rough opening width at least 1/2” wider on either 
side than the outside unit frame width and rough 
opening height about 3/4” (or less) taller than the 
total unit height depending on how level the support 
structure above is (check to comply with applicable 
codes for maximum shim space allowed). See Sheet 2 of 
the Installation Manual. It is important that the opening 
be the correct size.  Note that the outside frame height 
of the unit ordered is measured from the finished floor. 

Product performance that includes operation, depends 
on having the gap between the bottom of the panel 
and the finished floor level to be maintained at 7 mm 
(1/4”) and also the gap between the top of the panel 
and the bottom of the head track to be maintained at 
a nominal gap of 15 mm (9/16”). The running carriages 
can be adjusted, if needed. The finish floor needs to be 
absolutely level across the length of the opening and in 
the stacking bay.

The track length and layout have been supplied based 
on the configuration and sizes chosen and approved. 
Please refer to the layout drawing of your particular 
PrivaSEE project for the correct location of the support 
structure (by others) for the support of the head track 
at the opening, stacking route and stacking bay. It is 
important that the system is properly supported at the 
top and at the proper locations.

NANAWALL PRIVASEE OWNER’S MANUAL

PAGE 4 OF 15

Summary of Contents for PrivaSEE

Page 1: ...vaSEE Single Track Sliding Frameless System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through N...

Page 2: ...ass thickness for the panels is based on the Glass Association of North America GANA recommended minimum glass thickness for fully tempered Interior butt glazed fixed glass panels The PrivaSEE system...

Page 3: ...g Panel Sliding Panel Maximum Unit Height 10 6 3200mm 10 6 3200mm 10 6 3200mm Maximum Panel Width 3 7 1100mm 4 1 1250mm 4 1 1250mm 1 A Binder 3 P Sound D DIAGRAM 1 EXAMPLE OF A 3 PANEL UNIT in this ca...

Page 4: ...ially to the edges of panels PREPARATION OF THE OPENING AND SUPPORT STRUCTURE ABOVE Make rough opening width at least 1 2 wider on either side than the outside unit frame width and rough opening heigh...

Page 5: ...support structure to be used in your particular application 5 The rough opening should be reasonably level plumb and square at all points There should be no unevenness or bowing Make sure that the hea...

Page 6: ...ligned to the panel locking Step A1 Look for the labels on the different upper track segments side jambs and sill segments and set them on the floor as per the layout on the product drawing Step A2 At...

Page 7: ...ar manner Make certain that the angles between different upper track components are exact If the stacking bay has parallel legs make sure that the legs are exactly parallel IMPORTANT ADJUST EACH ANCHO...

Page 8: ...this dimension on the floor as well Step B2 Take off the side jamb and make sure that you keep the correct shim space and horseshoe shims for each anchoring point Unscrew the bottom hinge from the sid...

Page 9: ...ft enough space for the single action offset end panels or non entry offset end panels See Sheet 9 of the Installation Manual Between panels there should be an even gap of about 5 32 4mm from top to b...

Page 10: ...ocket holes If concrete use a diamond core drill bit with the proper diameter size Step E4 Slide the proper sockets into the holes If necessary use suitable material to fix them in place F INSTALLATIO...

Page 11: ...hinge with the pivot box attached to the top track Line up both hinges and connect them with the hinge pin Secure the hinge pin from the side with the set screw Close the single action end panel or no...

Page 12: ...ngress and egress by tradesmen should be resisted Operation and Maintenance of Nanawall Products OPERATION OF A NANAWALL PRIVASEE SINGLE TRACK SLIDING SYSTEM For opening and closing the single track s...

Page 13: ...ls from the stacking bay you will need to grasp panels by the edges with one hand as high as possible Move evenly and keep sliding panels as vertical as possible Avoid any pendulum movements 8 Make su...

Page 14: ...moved with mineral spirits Heavier accumulations can be removed with a mild solution of household detergent For all surfaces aggressive alkaline or acid cleaners should not be used Excessive abrasive...

Page 15: ...tions for Flat Glass for quality thickness and dimensional tolerances Tempered float glass shall meet the current requirements of ASTM C 1048 Standard Specifications for Heat Treated Flat Glass Kind H...

Page 16: ...not otherwise addressed in this Warranty are warranted against defects in materials and workmanship that substantially impair operation and function for a period of 10 years from Delivery This include...

Page 17: ...e for on site product inspections NOTICE PROCESS Written notice of any claim under this Warranty with supporting documents such as photos or videos must be given to Nana Wall Systems Inc 100 Meadowcre...

Page 18: ...vision and cannot be detected from within 10 feet as per ASTM C 1036 Accidental or spontaneous glass breakage Glass breakage due to thermal stresses Film applied to the glass surface Industry accepte...

Page 19: ...________________ Project Address if different from above ________________________________________________________________________ INSTALLATION Installer Name ________________________________________ A...

Reviews: