8. MAINTENANCE
Remove the pedal Assy and tower Assy. (See P-2
1 “Dividing”
To be conducted
by a technician only.“)
q
Of the torque bolts
12)
at
the back of the
cabinet
Assy, loosen the
and
detach the top four, thus removing the maintenance panel.
Torque bolt (M5
12)
\
Rear panel
Loosen
emove the two connectors from the monitor.
This machine may come with a monitor having a differently-shaped frame depending on
the time of production. Check which type of monitor is used, Nanao-made or
monitor
(Loosen the two
screws, then unplug
the connector.)
5 2
Summary of Contents for TIME CRISIS 2
Page 1: ...__...
Page 76: ...10 PARTS L ST 10 PARTS LIST 1 O l Cabinet Assy...
Page 78: ...10 PARTS L ST 1 O 2 Signboard Assy 7 6...
Page 80: ...10 PARTS LIST 1 O 3 Control base Assy K I 1 c c 53 x3 0 1 78...
Page 81: ...10 PARTSLET 79...
Page 82: ...10 PARTS LIST 1 O 4 Rack Assy 0 c 0 cl cl...
Page 84: ...10 PARTS UST 10 5 Cord box Assy 6 _ r l 63 8 I I l L L J mm e...
Page 86: ...10 PARTS LIST 10 6 Tower Assy c3 cl zd 8 4...
Page 88: ...10 PARTS LIST 10 7 Pedal Assy 6 6...
Page 90: ...10 PARTS LIST 1 O 8 Gun Assy...
Page 92: ...10 PARTS LET 1 O 9 Coin Assy B 90...
Page 94: ...10 PARTS L ST 92...
Page 95: ...1 j i 1 i 1 i I 0 M I...
Page 96: ...11 Wiring Diagrah _ _ ____ __ _ _ ___ I I coin Assy j L _ _ _ EL I T o w e r Qsy 1...