6. MOVING AND TRANSPORTING
q
Remove the four flange sockets
x 20) from the tower Assy.
Detach the tower Assy from the cabinet Assy. After the detachment, house the portion of the
harness that sticks out of the tower Assy.
Tower
Harness
20)
q
Fix the joint cover with four torque bolts (MS x 12).
If the ceiling of the passage corridor or the top of the access door is too low. disas-
semble the signboard Assy for transportation. (See P-14. 5-2-l ‘Dividing the Signboard
and the Cabinet
2 2
Summary of Contents for TIME CRISIS 2
Page 1: ...__...
Page 76: ...10 PARTS L ST 10 PARTS LIST 1 O l Cabinet Assy...
Page 78: ...10 PARTS L ST 1 O 2 Signboard Assy 7 6...
Page 80: ...10 PARTS LIST 1 O 3 Control base Assy K I 1 c c 53 x3 0 1 78...
Page 81: ...10 PARTSLET 79...
Page 82: ...10 PARTS LIST 1 O 4 Rack Assy 0 c 0 cl cl...
Page 84: ...10 PARTS UST 10 5 Cord box Assy 6 _ r l 63 8 I I l L L J mm e...
Page 86: ...10 PARTS LIST 10 6 Tower Assy c3 cl zd 8 4...
Page 88: ...10 PARTS LIST 10 7 Pedal Assy 6 6...
Page 90: ...10 PARTS LIST 1 O 8 Gun Assy...
Page 92: ...10 PARTS LET 1 O 9 Coin Assy B 90...
Page 94: ...10 PARTS L ST 92...
Page 95: ...1 j i 1 i 1 i I 0 M I...
Page 96: ...11 Wiring Diagrah _ _ ____ __ _ _ ___ I I coin Assy j L _ _ _ EL I T o w e r Qsy 1...