NAG/IM/MTC1200/01/22
12
Input for Switch Test :
Switch Test Connection details are shown below :
Select menu option in keypad, press upward key, the
display shows in
1.
Switch test
2.
Edit date/time.
Enter Numeric key 1.
Computer Interface :
To interface with Computer USB
Switch Test
READ 50
OPEN :
CLOSE : 50