10
Subject to modifications
• 19, rue de Rennes • BP 83221 • F - 35690 ACIGNÉ
7.
HITCHING A FRONT IMPLEMENT
The linkage is in the operating position.
7.1
Open the locking catches on the hitching hooks and hitch up
the implement.
7.2
Close the locking catches on the hitching hooks.
Two possible scenarios: position 1, fixed position
position 2, floating position
arm in floating position; the implement follows the contours of
the ground
7.3
Hitch the 3rd link bar to the bracket on the front implement.
Caution
This operation must be carried out by the driver who must leave his seat and
ensure all controls are locked out while he is working on the front linkage.
1
2
2