background image

9. FITTING THE MIXER VALVE   

IMPORTANT: Ensure that you have read through section 7. IMPORTANT INSTALLATION INFORMATION before 

starting to fit the mixer valve.

1.  A rectangular hole between 200mm and 110mm 

should be large enough to fit the mixer valve. The 

valve should be fixed to the wall between 75mm 

and 95mm below the finished surface of the shower 

(Fig 1).

2.  The supply pipework can be plumbed from above 

or below but must finish at the suitable connections 

which should be at approximately 150mm centres, 

provision should be made for some adjustment on 

fitting valve.

3.  Fit a male 

¾

BSP elbow to 15mm or 22mm 

compression (not supplied) to both hot and cold 

inlets and the outlets, apply PTFE tape to seal the 

threads.

NOTE: It is recommended to apply PTFE tape to all 

threaded connections (boss white or other sealing 

compounds are not suitable).

You should measure the distance between the outlets 

on the mixer valve you are fitting to determine the 

exact distance.

4.   At this point you may wish to fit the pipework to 

oultets prior to any tiling.

5.  The valve should be attached firmly between 75mm 

and 95mm below the finished surface to allow the 

cover plate to fit neatly, using the two fixing holes on 

the valve. Position the valve centrally between the 

feed pipes and mark the screw positions, drill and 

plug the wall (Fig 2).

NOTE:  Make sure the mixer valve is kept in a clean 

place to prevent rubbish etc, getting into the opening 

while fitting the pipework. Tiling behind the trim plate 

must leave sufficient access to the valve for servicing 

later.

6.  Position the mixer valve onto the hot and cold water 

feed pipes and tighten the compression nuts. Hold 

the mixer valve in place and secure to the wall 

with screws. Make sure the mixer valve hot feed 

is connected to the inlet marked hot and cold inlet 

marked cold. The valve will not work correctly if 

connected the wrong way (Fig 3).

7.   Screw the two chrome cover sleeves onto both the 

control shafts (Fig 4). 

CAUTION

Check there are no hidden cables or pipes before drilling holes for wall plugs.  

Exercise great care when using power tools near water.  

The use of a residual current device (RCD) is recommended.

!

!

!

!

2

1

Approx 150mm

3

4

75mm - 95mm

Summary of Contents for Atmos 2 Way

Page 1: ...Fitting Instructions IMPORTANT This Step by Step guide should be retained after installation Atmos 2 Way Thermostatic Mixer Valve for Round and Square Valve Options...

Page 2: ...umof5barrunning pressure Themixervalvemustnotbesubjectedto watertemperaturesabove80 C Thismixervalveis alsosuitableforthermalstorage unventedsystems andpumpedgravitysystems IMPORTANT Beforeinstallingw...

Page 3: ...RTANT This Step by Step guide should be retained after installation Concealing Plate Nut Cover Please make sure ALL components are included before starting the installation Description Quantity MixerV...

Page 4: ...dent method of isolating the shower should maintenance or servicing be necessary these valves SHOULD NOT restrict the flow DO NOT operate the shower outside the recommended temperatures and pressures...

Page 5: ...Itis veryimportantthatforuseinanymainspressure systemsanexpansiontankandapressurereducing valvehasbeenfittedtoensurethepressuredoes notexceed5Bar Thisshouldbeconfirmedbytheinstallation engineerorcompe...

Page 6: ...thesame hotandcoldwaterpressures Ifthisisnotthecasea flowcontroller discwithsmallholes canbefittedto thehigherpressuresupplytothevalve Thisisbest donebytestingeachonetofindoutwhichgivesthe bestresults...

Page 7: ...pointyoumaywishtofitthepipeworkto oultetspriortoanytiling 5 Thevalveshouldbeattachedfirmlybetween75mm and95mmbelowthefinishedsurfacetoallowthe coverplatetofitneatly usingthetwofixingholeson thevalve P...

Page 8: ...ntothemixer valveuntilflushwiththetiles Fig5 NOTE Beforeassemblingthevalvecontrolsidentify allthepartsandcheckthatboththeredmarkingson thecontrolshaftofthethermostaticcontrolareinline 11 Fittheon offk...

Page 9: ...becheckedtoconfirmthe waterisolationperformscorrectly Runthevalveat the38 Cstopposition Checkthewatertemperature 5 Turnoffthefeedofcoldwaterusingtheisolation valve Thewaterflowshouldfalltoaverylowflow...

Page 10: ...evalveandcleanfilters 4 Showerheadblocked CleanShowerhead 5 Systemnotcapableofsupplyingmultipleoutlet atthesametime Reducesimultaneousdemand Checkstop servicevalvesarefullyopen Checkifenough waterpres...

Page 11: ...ustomer 2 Thisguaranteeispersonaltotheoriginalpurchaserofthe productandisnottransferable 3 Originalproofofpurchase s mustbeshownforanyclaim underthisguarantee 4 Thisguaranteedoesnotcoveranyproductstha...

Page 12: ...from this list without prior notice being given 67531KL JULY2016 14 SERVICEPOLICY IntheeventofyouneedingtocontacttheMXGroup CustomerServiceDepartment thefollowing procedureshouldbefollowed 1 Beforetel...

Reviews: