
Patriot 1:1 Adhesive System Operations Manual
Rev. 07/2016
Page | 22
7.
To lower barrel piston down into the pail, move the ram up/down handle to down position (see fig. 13).
8.
Slowly open the Pail Lift valve to raise the material pails to compensate for any difference in
material levels in the pails (see figure 13).
Figure 13
NOTE: Allow time for air to be pushed out of the air bleed off valve at the top of the barrel piston
(fig. 12).
9.
Once barrel piston has come to a complete stop and a small amount of material starts to come out
the bleed off valve close the bleed off ball valves (see figure 12).
10.
Remove mixer assembly from the front of the gun if it has not already been removed.
11.
Position the gun over an appropriate waste container to allow priming of lines
12.
Pull and lock the gun trigger into the ON position.
13.
Slowly turn up pump pressure the Pump should begin to stroke, check for leaks on all hose
connections. Material will flow to the gun (see figure 14).
Figure 14
Ram UP/DOWN Valve
Pail Lift valve
Pump pressure regulator and gauge
Summary of Contents for PATRIOT 1:1
Page 1: ...Rev 07 2016 PATRIOT 1 1 ADHESIVE UNIT Operations Manual ...
Page 38: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 38 ...
Page 39: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 39 ...
Page 40: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 40 ...
Page 41: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 41 ...
Page 42: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 42 ...
Page 43: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 43 ...
Page 44: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 44 ...
Page 45: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 45 ...
Page 46: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 46 ...
Page 47: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 47 ...
Page 48: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 48 ...
Page 49: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 49 ...
Page 50: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 50 ...
Page 51: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 51 ...
Page 52: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 52 ...
Page 53: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 53 ...
Page 54: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 54 ...
Page 55: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 55 ...
Page 56: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 56 ...
Page 57: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 57 ...
Page 58: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 58 ...
Page 59: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 59 ...
Page 60: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 60 ...
Page 61: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 61 ...
Page 63: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 63 ...