
Patriot 1:1 Adhesive System Operations Manual
Rev. 07/2016
Page | 17
Hose Connections:
1. Attach Yellow Flush Tube (solvent to the gun) to the outlet (SOLVENT) side of the flush tank (see fig. 1)
2. Attach ¼ inch poly tube from the air manifold to the flush tank regulator (AIR). (see fig. 1)
3. Connect the Air Purge supply to the Air purge regulator on the air manifold (see fig. 2
Figure 2
4. Connect the Resin Hoses from the gun to the outlet port on the material manifolds. The resin hoses
are color coded to match the fluid section and material manifold.
5. Connect the Green Signal line from the gun to the pressure valve PLV-1000 on the material manifold
(see fig. 3).
Figure 3
6. Connect the Gun Air Supply from the back of the gun handle to the air manifold.
7. Install the proper fitting into the Main Air Supply Ball Valve and connect the air supply. The Ball Valve
comes with a 1/2" NPT Female port. (see fig. 4) (Use caution when using quick disconnects as they
may restrict air flow.)
Green Signal line from the
Gun to the Pressure Valve on
the Material Manifold.
Air Purge Regulator connection
Air Purge Regulator
Summary of Contents for PATRIOT 1:1
Page 1: ...Rev 07 2016 PATRIOT 1 1 ADHESIVE UNIT Operations Manual ...
Page 38: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 38 ...
Page 39: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 39 ...
Page 40: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 40 ...
Page 41: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 41 ...
Page 42: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 42 ...
Page 43: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 43 ...
Page 44: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 44 ...
Page 45: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 45 ...
Page 46: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 46 ...
Page 47: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 47 ...
Page 48: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 48 ...
Page 49: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 49 ...
Page 50: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 50 ...
Page 51: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 51 ...
Page 52: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 52 ...
Page 53: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 53 ...
Page 54: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 54 ...
Page 55: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 55 ...
Page 56: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 56 ...
Page 57: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 57 ...
Page 58: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 58 ...
Page 59: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 59 ...
Page 60: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 60 ...
Page 61: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 61 ...
Page 63: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 63 ...