MAINTENANCE MANUAL
VCE-MM-02
26
Note1: To install a new Tool Carriage or replace the original Tool Carriage simply reverse the steps
for Tool Carriage removal.
Note2: Remember to separate the Sprung Washer/Rollers, and then place them on the Carriage track
before you swing the Tool Carriage back into place
2. Swing the Tool Carriage down and out while keeping the
Sprung Washer/Rollers apart.
Summary of Contents for ValueCut VC-1300
Page 1: ...No VCE MM 02 Cutting Plotter VC 600 VC 1300 VC 1800 MAINTENANCE MANUAL...
Page 8: ...MAINTENANCE MANUAL VCE MM 02 8 A Main Unit Assembly Recommend Service Parts...
Page 10: ...MAINTENANCE MANUAL VCE MM 02 10 C Left End Assembly Recommend Service Parts...
Page 11: ...MAINTENANCE MANUAL VCE MM 02 11 D Right End Assembly Recommend Service Parts...
Page 12: ...MAINTENANCE MANUAL VCE MM 02 12 E X Motor Bracket and Belt Assembly Recommend Service Parts...
Page 13: ...MAINTENANCE MANUAL VCE MM 02 13 F Carriage Assembly Recommend Service Parts...
Page 14: ...MAINTENANCE MANUAL VCE MM 02 14 G Pinch Roller Assembly Recommend Service Parts...
Page 15: ...MAINTENANCE MANUAL VCE MM 02 15 H Main Beam Assembly Recommend Service Parts...
Page 16: ...MAINTENANCE MANUAL VCE MM 02 16 I Drum Assembly Recommend Service Parts...
Page 17: ...MAINTENANCE MANUAL VCE MM 02 17 System Diagram and Components of Main Board...