
As from: 02.05.2006
Murrplastik Systemtechnik - ACS Werner Tubach
9
8902864602
MP Engraving unit
3.0 Assembly and connection
Steps to mount the engraving unit:
3.1 Demounting of the plotter‘s penholder unit
Remove the red cover cap and pull out the red locking pin.
Carefully draw off the lowering unit upwards from its holder.
Make sure not to damage the unit holder.