I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
Page 6 of 13
CONTEMPORARY WATER COOLERS
Date:
04/03/18
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
7109-700-001
WATER COOLERS
MURDOCK MFG. •
15125 Proctor Avenue • City of Industry, CA 91746 USA
Phone 800-453-7465 or 626-333-2543 • Fax 626-855-4860 • www.murdockmfg.com
Member of
Please visit
www.murdockmfg.com
for most current specifications.
MCBF2 (Install/Maintenance Instructions)
RETRO-FIT INSTALL FOR EXISTING WATER COOLER FIXTURE (NON-PRESSURIZED UNIT):
RE-PIPING FROM NON-PRESSURIZED TO PRESSURIZED (FOR -GF & -BF ONLY)
To re-pipe a single non-pressurized unit to pressurized, you will have to move the water supply tubing around, with “
NO
”
additional tubing needed. Before performing this task you
MUST SHUT OFF THE WATER SUPPLY
, and disconnect all supply
connections.
STEP 3:
From the outlet of the cartridge assembly, connect to
the bubbler.
STEP 1:
Starting with the supply line coming from the wall,
connect to the inlet of the evaporator assembly.
STEP 2:
From the outlet of the evaporator assembly, connect to
the inlet of the cartridge assembly.
Wall Supply Connection
17" Water Supply Tubing
Evaporator Inlet Connection
13" Water Supply Tubing
Bubbler Connection
Cartridge Assembly
Outlet Connection
Cartridge Assembly
Inlet Connection
Evaporator Outlet Connection
To Bottle Filler or Glass Filler
Add 1
4
" Tee for Both BF or GF