Prior to roughing in, consult with local, state, and federal codes for proper mounting height.
DIMENSIONAL DRAWING
A152-VR-BF4
Page 5 of 20
Date:
10/28/2020
7021-023-001
MURDOCK MFG. •
15125 Proctor Avenue • City of Industry, CA 91746 USA
Phone 800-453-7465 or 626-333-2543 • Fax 626-855-4860 • www.murdockmfg.com
Member of
30
1
4
"
31
1
8
"
16"
1
2
56
1
4
"
Installation Instructions:
A
- Provide 30-1/4" wide x 31-1/8" tall wall opening at
appropriate height. Provide structure support around
inside of the opening for frame anchoring.
B
- Carefully remove Bi-Level Moutning Frame 1 , and
panel from packaging preventing damage.
C
- Center both frames within wall opening with side,
top, and bottom lips overalpping outside the opening
and up against finished wall face. Secure to wall
through the sides, top and bottom using hardware 2
by others ensuring 16" centerline dimension
left-to-right.
Notes:
1-Standard Bi-Level rough-ins shown. For -RBL Reverse Bi-Level, -RBL
Mounting Frame rough-ins opposite
CONTEMPORARY WATER COOLERS
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
DRINKING FOUNTAINS