15
SLT968 INSTALLATION
Take the product out of the packaging and place
it on a suitable surface: we suggest to use a soft
material like a sponge or a cloth.
This information is very important for the
creation of the plasterboard structure.
Installation
entails
the
lowering
of
the
plasterboard ceiling, as the appliance shall be
installed at a maximum distance of 2100mm
from the floor in order to ensure good operation
and performances The hood can be installed at
a minimum distance of 300mm and at a
maximum distance of 480mm from the solid
ceiling.
In case ceiling lowering results greater than the
aforementioned maximum distance required, you
will need to use longer threaded bars.
In order to make installation operations easier,
we suggest to create only the metal structure
close
to
the
hood,
without
using
the
plasterboard. Please remind that the recess
which
will
house
the
hood
should
be
1065x665mm
and that the weight of the
plasterboard shall not rest on the hood.
Provide the area where the hood is being
installed with power supply and with the 150mm
diameter or similar section duct necessary to
discharge the air.
Draw the holes for installing the appliance on the
solid ceiling (Fig. 3). Drill the holes previously
outlined using an 8mm diameter twist drill and
secure the metric dowels and the threaded bars
supplied into the holes (fig. 4).
The appliance has the motor air out-let
positioned on its short side; nevertheless you
can choose the side of the hood from which
collected air is to be discharged as follows: open
the panel, following the instructions given in the
‘USAGE' section and remove the grease filters.
Remove the 4 screws, as shown in figure 5.
Remove the lower plate, as shown in figure 6.
Remove the motor fixing screws, as shown in
figure 7.
Make a hole either in the center of the hood top
side (fig. 8) or long side (fig. 9).
Fix the metal cover where the motor was
previously placed using the four screws
supplied. (fig. 10). If you choose to install the
motor with the air outlet directed upwards,
installation will not entail the use of the motor
supporting metal plate, as the motor will be fixed
directly on the hood body, as shown in figure 11.
Bring the hood close to the ceiling and carry out
the electrical and the air outlet duct connection
as well.
Install the hood on the ceiling and secure it by
screwing the nuts supplied to the threaded bars.
(fig. 12).
If you choose to have the air outlet on the hood
short side, the exhaust duct fixing operations
can be made easier by removing the cover
shown in fig. 13.
The plasterboard structure shall not rest on the
hood.
FILTERING VERSION
In case the appliance is used in the filtering
mode, activated charcoal filters need to be
installed, as shown in Fig. 14.
The air outlet ducting for discharging vapours
outside the plasterboard recess, shall also be
provided in this case.
Summary of Contents for SLT968
Page 2: ...2 ...
Page 4: ...4 TARTALOMJEGYZÉK Figyelmeztetések Felhasználások SLT968 telepítése Működés Karbantartás HU ...
Page 12: ...12 CONTENTS Warnings Uses SLT968 Installation Working Maintenance GB ...
Page 20: ...20 ...
Page 21: ...21 ...
Page 22: ...22 ...
Page 23: ...23 ...