4
3. OPERATION PROCEDURE
3-1 Name of Part & Explanation
①
Clamp CT
: Current detection sensor, clamp-on method
②
Open/Close Lever
: By pushing to inside, CT will be opened
③
Range Switch
: For power On/Off, ACmA, ACA, Line Current CVT
and Line Current CV. By auto power off function,
power will be off automatically approx. 10 minutes
after the final switch operation. To power on again,
set rotary switch once to OFF and power on again.
④
Frequency Change Switch : Set according to power supply frequency (50 or
60Hz)
⑤
Data Hold Switch
: By push one time, “DH” sign will be on LCD and the
data will be hold. By push once more, this function
will be released.
⑥
“m” Conversion Switch
: In case of hi-voltage phase current measurement,
the storey capacitance is 38mA/100m both for CVT
and CV cable. This instrument will show the length
of hi-voltage, incoming line in “m” (meter) by
conversion when no loading at hi-voltage end. By
push one time at hi-voltage line current range, “m”
mode will appear and “mA” mode will become again
by push once more.
⑦
Display
: Digital display of measured value, unit symbol and
battery sign.
⑧
Battery Compartment
: Batteries are installed (back side)
⑨
Hand Strap
: Preventing drop of the instrument by applying to
the wrist during measurement.