Configuring TRAIL-Control
Calibrating TRAIL-Control
6
30322332-02-EN
V2.20160912
27
⇨
The following screen appears:
2.
Set up the trailed implement on flat ground in a line behind the tractor. Drive straight for a few
meter until the tracks of the field sprayer run precisely into the tracks of the tractor.
or
– set the middle position with the function keys.
3.
Stop the tractor as soon as the field sprayer is exactly in line behind the tractor.
4.
- Start the calibration of the middle position.
⇨
The following message appears:
"Middle position: the calibration is ready"
5.
- Confirm within 3 seconds.
⇨
Calibration is initiated.
⇨
The following message appears:
"Middle position: the calibration is running"
⇨
Phase 1 is completed when the message 'Middle position: the calibration is running" is no
longer displayed.
⇨
You have calibrated the middle position.
6.
You can start phase 2 of the calibration.
Phase 2: Recording the limit stops
1.
- Steer the trailed implement fully to the left.
2.
- Start calibration.
⇨
The following message appears:
"Most left position: the calibration is ready"
3.
- Confirm within 3 seconds.
⇨
Calibration is initiated.
⇨
The following message appears:
"Most left position: the calibration is running"
4.
Wait until the message "Most left position: the calibration is running" is no longer displayed.