VRC4500/5000 VERTICAL WINDLASS 

 INSTALLATION 

4

LOCATING THE WINDLASS 

When installing the windlass it is important to consider the 
following requirements for efficient operation of the whole 
anchoring system. 

A clear and horizontal Chain Path  
Correct Positioning and Locker Depth 
Maximizing the Wrap of Chain around the Gypsy 
Position of the Motor and Gearbox Under deck 
Insulation of Dissimilar Metals 

The  windlass  should  be  positioned  centrally  over  the  chain 
locker.  This helps to maximize the fall of chain down to the 
locker as it piles up when retrieving the anchor (See the fall 
depth table).  
It  is  a  common  mistake  to  locate  the  windlass  too  far 
forward,  or  too  close  to  the  bulk  head,  where  there  is 
insufficient  room  for  the  chain  and  anchor  stowing.    In 
installations  where  this  is  not  possible  a  length  of  'lead  in' 
tube  with  a  belled  end  and  a  bore  of  at  least  2  times  the 
chain  width  can  be  used  to  guide  the  chain  to  the  centre  of 
the  chain  locker.  This  extension  needs  to  be  a  minimum  of 
45

0

  to  90

from  the  under  deck.  Angles  less  than  45

will

increase chain drag within the tube. 

The gear drive can be fitted in multiple positions to allow the 
chain  to  fall  away  from  the  motor.  If  the  motor  is  positioned 
near  the  falling  chain  then  the  lead  in  tube  is  also 
recommended to protect the motor from water. 

Chain Size 

Minimum Fall Depth To 
Top Of Heaped Chain 

Up to 1/2” (13mm) 

36” (914mm) 

5/8” to 7/8”(16 to 22mm) 

48” (1220mm) 

1” (25mm) and Above 

48” (1220mm) or Greater 

When  fitting  the  base  plate  all  mating  surfaces  should  be 
coated  with  sealant,  to  ensure  enough  is  applied  allow  it  to 
squeeze out as the mounting bolts are tightened. 
After  fitting  the  base  plate  in  the  desired  position  the 
windlass  can  be  reassembled  using  the  assembly 
instructions on the following page. 

The chain pipe should be fitted last making sure to match the 
height of the chain from the gypsy. Ideally this should line up 
with  the  chain  after  it  has  wrapped  180  degrees  around  the 
gypsy;  this  angle  of  wrap  should  not  be  less  than  140 
degrees  for  the  correct  operation.  Refer  to  diagram  in 
appendix for correct chain pipe and peeler setup 

If the  windlass is to  be mounted on a steel  or alloy  deck an 
insulator, preferably some form of rigid plastic must be used 
to  avoid  contact  of  dissimilar  metals.  It  is  also  advisable  to 
insulate the mounting bolts with plastic sleeves.  

If  the  vessel  has  a  curved  deck  an  appropriately  shaped 
mounting block must be used.  

Reassemble the windlass, fitting the shaft and top assembly 
complete, (refer exploded view) using a waterproof grease to 
lubricate all parts and running gear. 

It is important to thoroughly lubricate all mating surfaces with 
grease suitable for marine applications before use. As the 
windlass will be operating in an extremely corrosive 
environment it is also highly recommended that corrosion 
protection be used on the external surfaces of the motor, 
gear drive and adaptor, and also in any areas where water 
may lie to protect against moisture in the chain locker (See 
the maintenance section for additional information). 

ELECTRICAL INSTALLATION

 

Ensure all wiring is completed as per supplied wiring 
diagram and that all circuit components and wire is suitable 
for the system rating. To maintain the manufacturer’s 
warranty on the windlass a suitably rated overload protection 
must be installed to protect the motor. 

HYDRAULIC INSTALLATION 

To ensure minimal pressure loss or heat build up, it is 
recommended that hydraulic piping of the following minimum 
size is used. 

Length of Line 

Pipe Size (Outside Diameter) 

Up to 30’ (9.1m) 

5/8” (16mm) 

Over 30’ (9.1m) 

3/4” (19mm) 

To maintain the manufacturer’s warranty on the windlass a 
pressure relief valve must be installed to the hydraulic circuit. 
Muir also recommends that a counterbalance valve be 
installed to the hydraulic motor to prevent runback.

4500

Summary of Contents for VRC4500

Page 1: ...ESIGNED MANUFACTURED AND SUPPLIED BY Muir Engineering Group Pty Ltd HEAD OFFICE 100 Browns Road Kingston 7050 Tasmania Australia Tel ITN L 61 3 AU 03 6229 0600 Fax ITN L 61 3 AU 03 6229 7030 Email info muir com au Web www muir com au T h e w o r l d p o w e r i n w i n d l a s s e s a n c h o r i n g s y s t e m s ...

Page 2: ...IPTIONS Line Type Gearbox Description Motor Description SECTION 3 WINDLASS INSTALLATIONS Installation Operation Safety Maintenance Lubrication Bolt Torque Settings SECTION 4 APPENDIXES Motor Specifications Gearbox specifications Exploded general layout drawings Warranty ...

Page 3: ... The brake band controls the run of the anchor and chain The capstan is keyed directly to the drive shaft and the gypsy is driven by engaging the clutch All components are of bronze or stainless steel construction LINE 12 5mm U2 Kenters GEARBOX Manufacturer STM Description Single Stage 90 Degree Worm Wheel Gearbox Model RMI 110 F2 Ratio 70 1 MOTOR Manufacturer WEG Model 440V 4kW 3Ph 50Hz ITEM FEAT...

Page 4: ...st making sure to match the height of the chain from the gypsy Ideally this should line up with the chain after it has wrapped 180 degrees around the gypsy this angle of wrap should not be less than 140 degrees for the correct operation Refer to diagram in appendix for correct chain pipe and peeler setup If the windlass is to be mounted on a steel or alloy deck an insulator preferably some form of...

Page 5: ...ower or by the motor shaft to ensure windlass is free to rotate 7 Start the windlass with no load and ensure that direction of rotation is correct and check that windlass is operating with no undue noise or vibration 8 Continue running in the motor and gear drive for 30 minutes Re check gear drives oil level and grease points 9 If the torque limiter is present by the factory refer to gearbox infor...

Page 6: ...e clockwise to release gypsy drive by rotating the windlass clutch with the lever handle anticlockwise This applies to both cone and dog clutch A chain stopping device must be fitted forward of the windlass to take the mooring load off the windlass as this will result in serious damage being done to the winch By slowly releasing the brake the fall of the anchor can be controlled Once the anchor is...

Page 7: ...ctical to mark the chain in several positions approx 5 meter intervals from the anchor to alert the operator to the anchor position As the anchor breaks the water the control should be released and the windlass inched until the anchor is in the stowed position Under no circumstances should the winch be operated if it is stalled or overloaded Never engage the clutch as the anchor is free falling us...

Page 8: ...r marine applications Greasing points for the various parts of the windlass are as follows 1 Brake band Grease nipples Located on each brake band lug to lubricate thread and shaft Apply 1 2 pumps to each NOTE Alternate design NO GREASE NIPPLES disassemble shaft grease shaft and brake band lugs reassemble 2 Base Grease nipple Located in the top flange of the base plate lubricates the rotation of th...

Page 9: ......

Reviews: