5
3. Kitchen Smart
Kitchen Smart
Power Supply
Spring-loaded Lever
Push to open pin
Manual
1. Install the spring-loaded levers. Installation must
be performed by a skilled installer to avoid
damage and injury!
Risk of injury by spring-loaded lever assembly! Do not push
lever assembly down without unit attached.
Risk of damage to spring-loaded lever assembly! Do not push
lever assembly down without unit attached. To retract hinges
the Unit must be attached.
Click
Click
2. Ensure the Kitchen Smart is not connected to
power. Attach Kitchen Smart to the Spring-
loaded Levers.
3. Now, install the mounting clip for the push to
open pin. Recommended to install on the bottom
right or left of the cabinet.
4. Attach push to open pin to the mounting clip and
adjust.
CLICK!
1
2
5. Now, connect power to the Unit. Follow the
instructions on the menu with touch screen. For
detailed operating information, please read the
manual.
6. Enjoy your new Kitchen Smart from Mues-Tec.
We thank you for your trust and sincerely hope
you are pleased with your purchase. MUES-TEC
is always the right choice!
Our team is at all times available for feedback or
questions.
Camera ON/OFF Switch
LAN
DC-12V
USB
Power ON/OFF Switch