Final steps
1.
Clean mating faces on cylinder head and charge-air manifold.
2.
Check gaskets for damage and replace them, if required.
3.
Coat gaskets with assembly compound and place onto cylinder head.
4.
Install leak-off-fuel lines.
5.
Install charge-air pipes.
6.
Install engine governor (→ Page 107).
7.
Open fuel supply line.
8.
Vent fuel system (→ Page 58)
MS150111/01E 2014-05
| Task Description | 57
TIM-ID: 0000050910 - 001