Running the Example HCF Test
Landmark™ Test System Operation
57
3. Prepare to Run the Test
A.
“Perform Basic Performance Tuning”
B.
“Switch to Peak Valley Meters”
C.
D.
“Show Station Manager Scope and Meters for the Test”
E.
4. Run the Test
A.
B.
C.
“If Necessary, Correct Any Resource Errors”
D.
E.
F.
G.
H.
“Save the Test and Minimize MPX”
5. Remove the Specimen
A.
B.
“Switch to Running Max/Min Displacement and Force Meters”
C.
“If Appropriate, Remove the Intact Specimen”
D.
“If Appropriate, Remove the Broken Specimen”
6. Recover from a Tripped Limit
A.
“If Necessary, Recover from a Tripped Force Limit”
B.
“If Necessary, Recover from a Tripped Displacement Limit”
Prepare for Specimen Installation
Preparing for specimen installation consists of the following tasks:
1.
2.
“Open the Station Manager Application”
3.
4.
“Set Up Meters for Specimen Installation”
5.
“Set Limits for Specimen Installation”
6.
7.
Summary of Contents for Landmark 370 Series
Page 39: ...System Introduction Landmark Test System Operation 39...
Page 40: ......
Page 114: ......
Page 122: ......
Page 123: ...Decommissioning Landmark Test System Operation 123 Decommissioning Decommission 124...
Page 132: ......
Page 133: ......